Document Page: First | Prev | Next | All | Image | This Release | Search
File: aaame_02.txt
C. IF LIQUID CONTAMINATION IS DETECTED ON THE CWU-77/P,
PRELIMINARY TESTING SHOWS THE COVERALL MUST BE REPLACED WITHIN
TWO HOURS TO PREVENT OPERATIONALLY SIGNIFICANT SKIN SYMPTOMS FROM
OCCURRING. WE DO NOT FEEL CONFIDENT THAT THIS REQUIREMENT IS
LOGISTICALLY OR OPERATIONALLY FEASIBLE AT THE PRESENT TIME.
D. THE CWU-77/P IS NOT COMPATIBLE WITH THE MULTIMAN INTERMITTENT
COOLING SYSTEM (MICS) CURRENTLY DEPLOYED AT MOST LOCATIONS.
E. WE AT CENTAF AND YOUR BASE-LEVEL DISASTER PREPAREDNESS
PERSONNEL DO NOT HAVE SUFFICIENT INFORMATION TO DEVELOP
COMPREHENSIVE TRAINING OUTLINES FOR TRAINING THE BASE POPULATION.
AVAILABILITY OF INSTRUCTORS AND FEASIBILITY OF RELEASING
PERSONNEL TO ATTEND TRAINING SESSIONS MAY ALSO PRESENT PROBLEMS.
F. AT THIS TIME THERE IS NOT A CRITICAL SHORTAGE OF GCE'S WITHIN
THE AOR. FURTHER, PRESENT TEMPERATURE RANGES DO NOT WARRANT THE
CWU-77/P'S REPORTED THERMAL BURDEN ADVANTAGES OVERRIDING ALL
OTHER FACTORS.
3. POC'S ARE [(b) (2)], AND [(b) (2)].
[(b) (2)]
[(b) (2)], COl, ADO MINIMIZE CONSIDERED
CWU77P
Document Page: First | Prev | Next | All | Image | This Release | Search