Document Page: First | Prev | Next | All | Image | This Release | Search

File: aaanm_04.txt
Page: 04
Total Pages: 11

04    11

		                                                                            	TO 4 METERS DOWN
FLOOD LIGHTS        		YES ELECT BACKUP  YES ELECT BACKUP 	YES
SHOULDER STABILIZED  	YES               		  YES				YES
SURFACE TYPE         	ASPHALT		  ASPHALT
CONDITION            		GOOD			  GOOD
WIDTH                		7.5 M			  7.5 M
(1). (U)  ASPHALT HAMMERHEAD AREA ON BOTH ENDS OF THE RUNWAY COULD PARK ?? AIRCRAFT EACH.  COMPASS ROSE COULD PARK UP TO FOUR AIRCRAFT.
(2). (U)  ENGINES CAN BE RUN UP IN SOME PARKING POSITIONS WITHOUT DAMAGE TO GROUND SURFACES OR STRUCTURES.  ENGINE TRIM PAD WITH BLAST FENCE AVAILABLE FOR MAX POWER RUN UP.
(3). (U)  THERE ARE NO QUIET HOURS OR OTHER POLICY RESTRICTIONS LIMITING
HIGH POWER ENGINE RUNS FOR MAINTENANCE, TAKEOFFS, AND LANDINGS. HOWEVER, DUE TO HIGH DAYTIME TEMPERATURES AND ROUTE SCHEDULING REQUIREMENTS, MOST FLYING IS DONE BETWEEN 2100 AND 0200 LOCAL AND 0600 TO 0900 LOCAL.  THEY HAVE TRAFFIC AT ALL TIMES AND MOST ENGINE RUN-UP MAINTENANCE IS DONE DURING THE ABOVE HOURS.
D. (U) PAVEMENT EQUIPMENT:
FUNCTION			TYPE				         QTY
DUMP TRUCKS		SMALL 1 1/2 CUBIC METERS	4
PAVING EQUIPMENT	RUBBER TIRED ROLLER		1
BULLDOZER			TD-7					1
20-TON CRANE		30 TON HYDRAULIC			1
FORKLIFT			10K WAREHOUSE FORKLIFT	1
(1). (U)  PAVEMENT MAINTENANCE AND SMALL QUANTITIES OF AGGREGATE FILL
MATERIAL IS AVAILABLE FOR RAPID RUNWAY REPAIR CAPABILITY.  A BATCH PLANT
IS AVAILABLE BUT NOT PRESENTLY USED.
E. (U)  UTILITIES:
(1). (U)  WATER SUPPLY
 (A). (U)  SOURCE:  (DESALINATED HIGH PH-8) 3 MAIN TANKS STORED IN 3,000
CUBIC/METERS/DAY USE ALL THEY PROCESS EACH DAY.
(B). (U)  PRODUCTION CAPACITY:  3,000 CUBIC/METERS/DAY
(C). (U)  CONSUMPTION:  3,000 CUBIC/METERS/DAY
(D). (U)  STORAGE CAPACITY:  3 TANKS (1,000 METERS/TANK)
(E). (U)  EMERGENCY POWER IS AVAILABLE FOR WATER SYSTEM OPERATION.
(F). (U)  WATER QUALITY:  POTABLE, NOT CHLORINATED, HIGH PH
(G). (U)  WATER SYSTEM IS NEW.
(2). (U)  ELECTRICAL POWER
(A). (U)  SOURCE:  ON SITE, 3 GAS TURBINES, COMMERCIAL HOOK
(B). (U)  CAPACITY PER DAY:  GAS TURBINE 3.3 MEGA WATTS EACH
(C). (U)  CURRENT CONSUMPTION PER DAY:	2/3 (AIRPORT)
							1/3 (AIR COND. SYSTEM)

[(b)(2)]


Document Page: First | Prev | Next | All | Image | This Release | Search