Document Page: First | Prev | Next | All | Image | This Release | Search
File: aaanm_08.txt
08 11
G. (U) WATER SUPPLIES ARE AVAILABLE ON THE AIRFIELD FOR REFILLING CRASH
TRUCKS AT BOTH FIRE STATIONS.
H. (U) DRUM AT THE FIRE STATION IS THE SOURCE OF FOAM RESUPPLY.
I. (U) INITIAL EQUIPMENT REQUIREMENTS ARE:
2 - NON TAC RADIOS PREFERABLY PROGRAMMABLE
500 LBS - DRY CHEM
1000 LBS - HALON
J. (U) FOLLOW ON EQUIPMENT REQUIREMENTS FOR ADDITIONAL AIRCRAFT ARE:
2 - ADOLL RADIOS PROGRAMMABLE
1000 GAL - FOAM
l000 LBS - HALON
K. (U) NON-USAF FIRE PROTECTION VEHICLES:
LOCATION &
WATER FOAM NUMBER WATER IN DISTANCE TO
MAKE QTY CAPACITY CAPACITY TURRETS GPM RATE FLIGHT LINE
OSKOS T2500 1 2500 GAL 230 GAL 2 1250 450 FT
CARMICHAEL 3 2000 210 2 1264 "
CARMICHAEL
RIV 1 200 20 1 200 "
CARMICHAEL
RESERVE 1 1500 170 2 800 "
WATER LUMP CAP
TANKER 1 2000 N/A N/A 300 GPM "
L. (U) STRUCTURE FIRE FIGHTING EQUIPMENT:
TYPE NUMBER WATER RATE IN GPM
PUMPER 1 800 GAL TANK (750)
AMBULANCE 1 N/A
LIGHTING TRUCK W/GUN 1 N/A
M. (U) CONCERNS:
(1). (U) CHIEF WOULD LIKE CHEMICAL GEAR FOR 40 FIRE FIGHTERS BUY OR BORROW.
(2). (U) NEED AUTONOMOUS 1 TRUCK CREW CAPABILITY P-20 NEW MODEL/P-19
(3). (U) NEED 8-12 FIRE FIGHTERS (2 WITH INITIAL 4 AIRCRAFT).
(4). (U) NEED 2 OR 3 MOBILE RADIOS PROM HOME BASE.
8. (U) MAINTENANCE
A. (U) FACILITIES: ONE BUILDING/HANGER OWNED BY GAMCO (GULF ACFT MAINT
CO) WILL HOLD TWO 747'S (NO DIMENSIONS AVAILABLE). GAMCO HAS A COMPLETE
MAINTENANCE FACILITY WHICH HAS LOX, NITROGEN SOME PMEL, SUPPORT, BLAST
FENCE, HANGER AND WASTE FACILITY. THERE IS A COMPLETELY ENCLOSED 400-200
TWO STORY POWERED AGE REPAIR FACILITY WITH FUELING AREA (2 LANES, 3
PUMPS).
B. (U) DEFUELING CAPABILITY IS UNKNOWN (THERE ARE NO FUEL BOWSERS)
[(b)(2)]
Document Page: First | Prev | Next | All | Image | This Release | Search