O4 10                   PP PP                         LG281500


ENGINES.
D. (U)  RUNWAY MAINTENANCE:
(1). (U)  THERE IS NO RAPID RUNWAY REPAIR TEAM AVAILABLE.  HOWEVER,
NORMAL PAVEMENT MAINTENANCE IS AVAILABLE FROM THIRD COUNTRY NATIONALS
(TCN) ON SITE ARE STILL DOING FACILITY CONSTRUCTION.  PAVEMENT
MAINTENANCE EQUIPMENT IS ON SITE AND CAN BE MADE AVAILABLE THROUGH THE
CONSTRUCTION CONTRACTOR.
(2). (U)  THERE ARE PRE CAST CONCRETE SLABS FOR FACILITY ONLY.
AGGREGATE FILL MATERIAL IS AVAILABLE AND A CONCRETE BATCH PLANT IS ON
SITE.  A READY MIX CONCRETE PLANT FOR WHITE CONCRETE IS AVAILABLE.
(3). (U)  RUNWAY MAINTENANCE EQUIPMENT:
FUNCTION        		TYPE				NUMBER
GRADERS			CAT 12 AND CAT 16		MANY
DUMP TRUCKS						MULTI
PAVING EQUIPMENT					MULTI
BULLDOZERS		TD-7
LOADERS			960 AND 980			MULTI
20 TON CRANE		MOBILE AVAILABLE		MULTI
FORKLIFT			MULTISIZE			MULTI
WATER TRAILER		WATER BOWSERS
RUNWAY SWEEPING	THERE ARE NUMEROUS SWEEPERS ON THE AIRPORT
				COMPLEX, BUT THE EXACT NUMBER IS UNKNOWN. 						SWEEPER SERVICE IS PROVIDED, HOWEVER, WHO 						PROVIDES IT WAS NOT DETERMINED DURING THE SURVEY. 				VACUUM TYPE EQUIPMENT HANDLED BY AIRFIELD 						MAINTENANCE AS FOLLOWS:
				RUNWAY			AS REQUIRED
				TAXIWAY			AS REQUIRED
				RAMPS			AS REQUIRED
E. (U)  UTILITIES:
(1). (U)  WATER SUPPLY
(A). (U)  SOURCE:  MUNICIPALITY DUBAI WATER COMPANY
(B). (U)  STORAGE CAPACITY:  ADEQUATE
(C). (U)  EMERGENCY POWER (HYDRANT SYSTEM) IS AVAILABLE FOR WATER
SYSTEM OPERATION.
(D). (U)  WATER QUALITY:  FILTERED AND PH CHECKED BY MUNICIPALITY AND
AT SITE.
(E). (U)  CONDITION:  POTABLE - NONCHLORINATED (WATER WAS CONSUMED AND
PERSONNEL DID NOT GET SICK).
(2). (U)  ELECTRICAL POWER
(A). (U)  SOURCE:  COMMERCIAL WITH BACK-UP 9.9 MEGA WATTS

(B). (U) CAPACITY PER DAY:  9 MEGA WATTS


[(b)(2)]