Document Page: First | Prev | Next | All | Image | This Release | Search
File: aaanp_04.txtO4 10 PP PP LG281500 ENGINES. D. (U) RUNWAY MAINTENANCE: (1). (U) THERE IS NO RAPID RUNWAY REPAIR TEAM AVAILABLE. HOWEVER, NORMAL PAVEMENT MAINTENANCE IS AVAILABLE FROM THIRD COUNTRY NATIONALS (TCN) ON SITE ARE STILL DOING FACILITY CONSTRUCTION. PAVEMENT MAINTENANCE EQUIPMENT IS ON SITE AND CAN BE MADE AVAILABLE THROUGH THE CONSTRUCTION CONTRACTOR. (2). (U) THERE ARE PRE CAST CONCRETE SLABS FOR FACILITY ONLY. AGGREGATE FILL MATERIAL IS AVAILABLE AND A CONCRETE BATCH PLANT IS ON SITE. A READY MIX CONCRETE PLANT FOR WHITE CONCRETE IS AVAILABLE. (3). (U) RUNWAY MAINTENANCE EQUIPMENT: FUNCTION TYPE NUMBER GRADERS CAT 12 AND CAT 16 MANY DUMP TRUCKS MULTI PAVING EQUIPMENT MULTI BULLDOZERS TD-7 LOADERS 960 AND 980 MULTI 20 TON CRANE MOBILE AVAILABLE MULTI FORKLIFT MULTISIZE MULTI WATER TRAILER WATER BOWSERS RUNWAY SWEEPING THERE ARE NUMEROUS SWEEPERS ON THE AIRPORT COMPLEX, BUT THE EXACT NUMBER IS UNKNOWN. SWEEPER SERVICE IS PROVIDED, HOWEVER, WHO PROVIDES IT WAS NOT DETERMINED DURING THE SURVEY. VACUUM TYPE EQUIPMENT HANDLED BY AIRFIELD MAINTENANCE AS FOLLOWS: RUNWAY AS REQUIRED TAXIWAY AS REQUIRED RAMPS AS REQUIRED E. (U) UTILITIES: (1). (U) WATER SUPPLY (A). (U) SOURCE: MUNICIPALITY DUBAI WATER COMPANY (B). (U) STORAGE CAPACITY: ADEQUATE (C). (U) EMERGENCY POWER (HYDRANT SYSTEM) IS AVAILABLE FOR WATER SYSTEM OPERATION. (D). (U) WATER QUALITY: FILTERED AND PH CHECKED BY MUNICIPALITY AND AT SITE. (E). (U) CONDITION: POTABLE - NONCHLORINATED (WATER WAS CONSUMED AND PERSONNEL DID NOT GET SICK). (2). (U) ELECTRICAL POWER (A). (U) SOURCE: COMMERCIAL WITH BACK-UP 9.9 MEGA WATTS (B). (U) CAPACITY PER DAY: 9 MEGA WATTS [(b)(2)]
Document Page: First | Prev | Next | All | Image | This Release | Search