Document Page: First | Prev | Next | All | Image | This Release | Search

File: aaanp_06.txt
Page: 06
Total Pages: 10

06   10                   PP PP                         LG281500


SERVICES.  THERE ARE 23 PARKING SPOTS FOR LARGE COMMERCIAL CARRIERS.
DUBAI INTERNATIONAL AIRPORT HAS HEAVY INTERNATIONAL CARRIER SERVICE TO
INCLUDE IRAN AIR.  HOST NATION AIR FORCE HAS ONE C-130 AND A SMALLER
AIRCRAFT ARE ON SITE.  THE AIRPORT SECURITY FORCES PROVIDE DISTANT
SUPPORT PROTECTION FOR THE FLIGHT LINE.  FOUR PATROL VEHICLES ON THE
PERIMETER PROVIDE CONTINUOUS SURVEILLANCE.  THE BASE CAN FURNISH
SECURITY POLICE FOR THE PROTECTION OF DEPLOYED SAC AIRCRAFT.  LIMITED
PROTECTION WILL BE PROVIDED TO SAC PARKING AREA.  CHIEF OF POLICE
AGREED TO PROVIDE OFFICERS TO JOINTLY PATROL A PERIMETER FENCE THAT
WILL BE ERECTED TO KEEP OUT THIRD COUNTRY NATIONAL (TCN) CONTRACTORS
BUILDING A NEW CARGO BUILDING IMMEDIATELY ADJACENT TO PARKING AREA.
HOST NATION WILL BUILD FENCE TO SEGREGATE TONS.  LIGHTING IN PARKING
AREA TO BE USED IS STILL UNDER CONSTRUCTION, THEREFORE, UNIT SHOULD
DEPLOY WITH PORTABLE LIGHT ALLS.
A. (U)  HOST NATION (AIRPORT DIVISION) OF DUBAl POLICE PROVIDES
AIRPORT SECURITY.  DEPUTY CHIEF OF AIR/POLICE REPORTS TO DUBAI POLICE
HQ BRIG GENERAL DAHI KHALPAN.  AIR POLICE OFFICE IS ON THE SECOND
FLOOR OF THE CIVIL AVIATION AUTHORITY COMPLEX.  TERMINAL AND RAMP
ENTRY/EXIT IS COVERED BY VARIOUS POSTED POLICE W/9MM SIDE ARMS.
AIRPORT ENTRANCE UNDER CONSTRUCTION AND TWO TEMPORARY GATES HAVE BEEN ESTABLISHED PENDING COMPLETION OF MAIN ENTRANCE.  INTERNAL FAIRLY TIGHT.  UNDER EMERGENCY CONDITIONS (HOSTILITIES) A SPECIAL
LOCAL UNIT OF UAE ARMY WILL AUGMENT AIRPORT POLICE.  ARMY WILL PATROL
AREAS AT BOTH ENDS OF RUNWAY EXTERIOR TO BASE PERIMETER.  THIS IS
VERY DIFFICULT DUE TO HEAVY POPULATION.
B. (U)  A MAJOR CONCERN IS THE LARGE NUMBER OF TON CONSTRUCTION
WORKERS THAT ARE BUILDING A NEW CARGO TERMINAL ADJACENT TO OUR
PROPOSED PARKING RAMP.  CIVIL AVIATION AUTHORITIES HAVE PROPOSED
BUILDING A FENCE TO SEGREGATE THE TONS.
C.   ALL 16 ACFT WILL NOT FIT ON THE NEW CARGO RAMP WHICH WILL
RESULT IN A SEPARATE PARKING AREA
D.   A FLIGHT[(b)(1) SEC 3.4 (b)(5)] (UTC-QFEBC) WILL BE REQUIRED FOR 16
ACFT.  THE INITIAL COP FORCE NEEDED FOR FIRST FIVE ACFT.
E. (U)  LOOKED AT A PROPOSAL TO BILLET PERSONNEL IN A HOTEL COMPLEX
NEXT TO THE AIRPORT.  CHANGING BED CONFIGURATION WILL SUPPORT
APPROXIMATELY 250 PERSONNEL.  WILL NEED TO BUILT A 8' FENCE W/OUT
RIGGER AROUND COMPLEX.  AN ADDITIONAL SQUAD WOULD BE REQUIRED TO
SECURE THIS COMPOUND.
6. (U)  TRANSPORTATION
A. (U)  VEHICLE REQUIREMENTS:
QUANTITY	TYPE
2*		MB-2 AIRCRAFT TRACTOR


 [(b)(2)}


Document Page: First | Prev | Next | All | Image | This Release | Search