Document Page: First | Prev | Next | All | Image | This Release | Search
File: aaasg_05.txtFACILITY TO STORE REFUELER MAINTENANCE EQUIPMENT. (2) PROPOSED SOLUTION: A PORTABLE HANGAR JUST ARRIVED TO COVER THIS REQUIREMENT. THANKS! PART III. (U) COMBAT SUPPORT. 1. THE COMBAT SUPPORT ELEMENT IS FULLY MANNED AND PROVIDING ALL REQUIRED SUPPORT. A. PROBLEM: THE CIVIL ENGINEER LACKS THE 5KV, 1/0 ALUMINUM CABLE REQUIRED TO INSTALL THE 4.16KV TRANSFORMERS. (1) DISCUSSION: ALL TRANSFORMER PARTS HAVE BEEN FOUND. THE 5KV, OT CABLE IS BEING SOURCED AT MYRTLE BEACH AFB SUPPLY. (2) PROPOSED SOLUTION: HQ CENTAF/DE COORDINATE SHIPMENT ONCE PAGE 06 RHIEFBA0356 PURCHASED. (3) REQUESTED SUPPORT: DIRECT THE SHIPMENT OF THE 50,000 FEET OF CABLE FROM THE CONUS TO THIS SITE. PROBLEM: TWO SHOWER/SHAVE UNITS, ONE EXPANDABLE SHELTER TWO SDC ARE REQUIRED TO SUPPORT 1ST SOW AND 31 ATH. 1) DISCUSSION: ONE SHOWER/SHAVE UNIT REQUIRED TO BRING THE 1 SOW UP TO THAT REQUIRED PER PERSON. THE SECOND SHOWER/SHAVE REQUIRED TO SUPPORT THE 31 ATH -- IT WILL BE 31 ATH'S ONLY SHOWER/SHAVE FACILITIES FOR PATIENTS. EXPANDABLE SHELTER REQUIRED FOR CIVIL ENGINEERING SHOP SPACE AT 1 SOW CAMP. SDC'S REQUIRED TO POWER SHOWER/SHAVE UNITS AND SHELTER. 2) PROPOSED SOLUTION: HQ CENTAF/DE SOURCE ASSETS. 3) REQUESTED SUPPORT: DIRECT THE SHIPMENT OF 2 SDCS, 2 SHOWER/SHAVE UNITS, AND ONE EXPANDABLE SHELTER TO THIS SITE. T 0356
Document Page: First | Prev | Next | All | Image | This Release | Search