Document Page: First | Prev | Next | All | Image | This Release | Search
File: aaasg_08.txtFACILITIES. (1) DISCUSSION: ELECTRICAL POWER IS IMPERATIVE TO OPERATE REFRIGERATORS TO PREVENT CREATION OF A DISEASE INFESTED AREA AND SIGNIFICANT HEALTH PROBLEMS. (2) PROPOSED SOLUTION: THE FOLLOWING EQUIPMENT IS REQUIRED FOR ELECTRICAL POWER: THREE 6 PLUG PDUS, THREE 8 PLUG PDUS, THREE SDCS, THREE SMALL TAN PDUS, 35 100 FOOT CABLES, 25 50 FOOT CABLES, 18 TENT LIGHT STRINGS, THREE 100KW GENERATORS, AND TWO REMOTE AREA LIGHTING KITS. (3) REQUESTED SUPPORT: REQUEST CENTAF SOURCE AND PROVIDE THE RESOURCES IN H (2) ABOVE. . PROBLEM: WE HAVE NOT RECEIVED OUR NEEDED PLASTIC TARPS THAT ARE CHEMICAL RESISTANT. PAGE 06 RHIEFBA0357 (1) DISCUSSION: WITH NOT HAVING ANY MAJOR WAREHOUSES TO STORE EQUIPMENT WE ARE IN CRITICAL NEED OF CHEMICAL RESISTANT PLASTIC SHEETS/ROLLS FOR CONTAMINATION AVOIDANCE. (2) PROPOSED SOLUTION: CENTAF ABO PLACE A HIGHER PRIORITY ON OUR LOCATION RECEIVING THE NEEDED MATERIAL. WE ARE BRIEFING ORGANIZATIONS ON USING ANY TYPE OF COVERING THEY HAVE AVAILABLE, BUT THE RELIABILITY OF THESE MATERIALS IS QUESTIONABLE. (3) REQUESTED SUPPORT: THE NECESSARY ASSETS BE OBTAINED, ALLOCATED OR REALLOCATED TO US BY CENTAF ABO. (U) PROBLEM: WE ARE SHORT APPROXIMATELY 54 REVETMENT KITS. (1) (U) DISCUSSION: WE HAVE INVENTORIED KITS ON HAND AND DO NOT HAVE THE AMOUNT ON HAND THAT THE STAFF THINKS ARE ON HAND. (2) (U) PROPOSED SOLUTION: LOCATE ADDITIONAL KITS TO PERMIT REVETTING THE MAJORITY OF AIRCRAFT. BT #0357
Document Page: First | Prev | Next | All | Image | This Release | Search