Document Page: First | Prev | Next | All | Image | This Release | Search

File: aaasm_05.txt
Page: 05
Total Pages: 17

05    21     171549Z    AUG    90    PP    RR                                                          DE

NO

TRANSIT POPULATION IS EFFECTING  LATRINE AVAILABILITY.  PRESENTLY HAVE

NO HARVEST FALCON LATRINES ON SITE.
                                    (Need 8 showers [HF])  (handwritten note)
	SHOWERS:   NEED HARVEST FALCON SHOWERS, THEY HAVE GOTTEN NONE 
          (need laundries  8 on order  none received)  (handwritten note)
YET.  PRESENTLY HAVE 1 750KW GENERATOR AND NEEDS THE OTHERS.

          OFFICE SPACE:  IN NEED OF SOME.  PRESENTLY GETTING BY.

          FIREFIGHTING EQUIPMENT:  BORROWED TWO P-19S FROM HOST

NATION.     (none received    no AFFF)  (handwritten note)

          AIRCRAFT SUPPORT (PARKING, BARRIERS, ETC.):  AIRFIELD LIGHTING

OK.  BARRIERS OK.  (parking space tight.  need revetment kits) (handwritten note)

       (2)     PERSONNEL

          CURRENT SITE POPULATION  = 2103

          NUMBER OF ENGINEERING PERSONNEL ON SITE  =  [(b)(1) sec 3.4 (b)(5)]

          NUMBER OF ENGINEERS BY UTCS REQUIRED  =  LISTED IN ORDER OF

PREFERENCE:  [(b)(1) sec 3.4 (b)(5)] OR [(b)(1) sec 3.4 (b)(5)] AND [(b)(1) sec 3.4 (b)(5)] OR

[(b)(1) sec 3.4 (b)(5)] TEAMS

          NUMBER OF FIRE FIGHTERS ON SITE  =  [(b)(1) sec 3.4 (b)(5)]

          NUMBER OF FIRE FIGHTERS BY UTC REQUIRED  =  [(b)(1) sec 3.4 (b)(5)

CURRENTLY ALRIGHT, EVENTUALLY NEED [(b)(1) sec 3.4 (b)(5)]

           NUMBER OF SERVICES PERSONNEL ON SITE  =  UNKNOWN

           NUMBER OF SERVICES PERSONNEL BY UTC REQUIRED  =  [(b)(1) sec 3.4 (b)(5)]


[(b)(2)]



                                                                                                                         171549ZAUG90

Document Page: First | Prev | Next | All | Image | This Release | Search