ENGR & SERVICES SUPPORT VEHICLES ON SITE: TWO CRANES, ONE
SWEEPER, NEED ALL TERRAIN FORKLIFTS DESPERATELY, ALSO NEED ALL THE
RRR EQUIPMENT.
C. KING ABDUL AZIZ INTERNATIONAL AIRPORT (JEDDAH NEW)
OIC ENGINEERING: MAJOR THORTON
OIC SERVICES: SSGT CHAVEZ
(1) EXISTING SITE CONDITIONS
WATER: ALL CONTRACTED BOTTLED WATER, SHOWERS AND LATRINES IN
CONTRACTED QUARTERS AND OFFICE SPACE ON BASE.
BILLETING: CONTRACTED HOTELS AND HOST NATION "VILLA" (HOST
NATION APARTMENT COMPLEX SURROUNDED BY A WALL) [(b)(1) sec 3.4 (b)(6)]
THE HOST NATION IS ALSO INSTALLING A/C AND BEDS IN THESE VILLAS FOR
US MILITARY USE. (getting a second "villa")
(handwritten note)
MESSING: AT THE HOTELS OR CATERED AT THE "VILLA"
(contractor full-kitchen in place 7 days at Armaskavil
LATRINES: ADEQUATE AT PRESENT 422 folks. 3 sep hotels, 338
folks + - 10, Sheraton Acall
SHOWERS: ADEQUATE AT PRESENT Attas. all folks out of hotels
in 4 days) (handwritten note)
OFFICE SPACE: ON THE BASE OR IN THE "VILLA", MOST OF THE
OFFICE SPACE IS ON BASE
FIRE FIGHTING EQUIPMENT: ONLY THE HOST NATION PROVIDING FIRE