11 21 171549Z AUG 90 PP RR DE
NO
NUMBER OF ENGINEERING PERSONNEL ON SITE = UNK
NUMBER OF ENGINEERS BY UTC REQUIRED = LISTED IN ORDER OF
PREFERENCE: [(b)(1) sec 3.4 (b)(5)] OR [(b)(1) sec 3.4 (b)(5)] AND [(b)(1) sec 3.4 (b)(5)] OR
[(b)(1) sec 3.4 (b)(5)] TEAMS
NUMBER OF FIRE FIGHTERS ON SITE = UNK
NUMBER OF FIRE FIGHTERS BY UTC REQUIRED = [(b)(1) sec 3.4 (b)(5)]
NUMBER OF SERVICES PERSONNEL = 0 PERMANENT PARTY, 1 SENT FROM
THUMRAIT TO EVALUATE THE SITUATION.
NUMBER OF SERVICES PERSONNEL BY UTC REQUIRED = [(b)(1) sec 3.4 (b)(5)]
(3) EQUIPMENT
BEDDOWN REQUIREMENTS: HARVEST FALCON INDEPENDENT NON-MUNITIONS EQUIPMENT SET
SHORTFALL OF HARVEST FALCON EQUIPMENT: UNK
ENGR & SERVICES SUPPORT VEHICLES REQUIRED: 3-REFER TRUCKS,
4-5TON DUMP TRUCKS, 9-EIGHT CUBIC YARD DUMP TRUCKS, 3-MANHOLE
CLEANING TRAILERS, 3-TRENCHERS, 3-IW70 FARM TRACTORS, 3-TOWED ROTARY
SWEEPERS, 3-D7 BULLDOZERS, 3-VACUUM CLEANERS, 3-SCOOP LOADER
W/BACKHOE (CASE LIKE BACKHOE), SIX 2-1/2 CUBIC YARD LOADERS, 3-SIZE 2
GRADERS, 3-VIBRATORY ROLLERS, 1500 GALLON WATER DISTRIBUTOR,
3-WHEELED EXCAVATORS, 3-PNEUMATIC TIRED TRENCHERS, SIX P-19
[(b)(2)]
171549ZAUG90