Document Page: First | Prev | Next | All | Image | This Release | Search

File: aaasm_16.txt
Page: 16
Total Pages: 17

16    21    171549Z    AUG     90    PP    RR                                                          DE

NO

	NUMBER OF ENGINEERING PERSONNEL ON SITE  =  UNK

	NUMBER OF ENGINEERS BY UTCS REQUIRED  =  [(b)(1) sec 3.4 (b)(5)]

	NUMBER OF FIRE FIGHTERS ON SITE  =  UNK

	NUMBER OF FIRE FIGHTERS BY UTC REQUIRED  =  [(b)(1) sec 3.4 (b)(5)]

	NUMBER OF SERVICES PERSONNEL ON SITE  =  UNK

	NUMBER OF SERVICES PERSONNEL BY UTC REQUIRED = [(b)(1) sec 3.4 (b)(5)]



           (3)      EQUIPMENT

	BEDDOWN REQUIREMENTS:   ONE HARVEST FALCON INDEPENDENT

NON-MUNITIONS EQUIPMENT PACKAGE.

	SHORTFALLS OF HARVEST FALCON EQUIPMENT PACKAGE:  UNK

	ENGR & SERVICES SUPPORT VEHICLES REQUIRED:  NOT CALCULATED YET

	ENGR & SERVICES SUPPORT VEHICLES ON SITE:  UNK

K.  PROJECTED BEDDOWN LOCATIONS

	[(b)(1) sec 3.4 (b)(5)]






	[(b)(2)]




                                                                                                  171549ZAUG90
 

Document Page: First | Prev | Next | All | Image | This Release | Search