Document Page: First | Prev | Next | All | Image | This Release | Search
File: aaaub_03.txt
PRIORITY
BASE COMMUNICATIONS CENTER
39O COSQ/DONA
PAGE 03 OF 03 RHIEFHA 0119 13/1415Z
J. AIR BASE OPERABILITY
(1) BASE RECOVERY AFTER ATTACK (BRAT) IS SEVERELY LIMITED.
(2) EOD LIMFACS:
(A) PERSONNEL: SHORTFALL OF NINE 464X0'S (7 IN-PLACE).
(B) VEHICLES: SHORTFALL OF THREE HUMMV'S AND THREE 4X4 6-PAX
TRUCKS.
(C) EQUIPMENT: SHORTFALL OF TWO SETS OF EOD EQUIPMENT AND BATTERY CHARGER FOR AN/PRL (SCOPE SHIELDED) RADIO BATTERY.
2. QUALITY OF LIFE.
A. SERVICES.
(1) BILLETING IN 5 LOCATIONS; 2125 BEDS GROWING TO 2350-
CONSOLIDATING HOW TO THREE LOCATIONS, INCLUDING A TENT CITY.
(2) RATIONS ON HAND:
MRES B-RATS OTHER DAYS SUSTAINABILITY
29,100 13,200 6,000 7 DAYS
(3) LIMFACS:
(A) SHORTAGE OF CRITICAL ITEMS TO COMPLETE TENT CITY.
(B) FIELD SHOWER AND FIELD LAUNDRY UNITS -- NONE ON STATION --
URGENTLY NEED THREE EACH TO SUPPORT CONSOLIDATION OF TROOPS INTO
TENT CITY.
(C) FIELD KITCHEN - 20 PERCENT OF REQUIRED ASSETS MISSING. MKT
REQUIRED TO SUPPORT SHELTER AREA AND EXPANDING TENT CITY.
3. COMMANDER EVALUATION: ABILITY TO SUSTAIN PROLONGED COMBAT
OPERATIONS IS IMPROVING DAILY. JP-4 FUEL SITUATION IS ACCEPTABLE.
TO MAXIMIZE WAR-FIGHTING ABILITIES, ADDITIONAL SPECIFIC PREFERRED
MUNITIONS PREVIOUSLY MENTIONED ARE DESIRED. TWICE WEEKLY DEDICATED
AIRLIFT BETWEEN RAF LAKENHEATH UK AND THIS LOCATION IS DESIRED TO
SUPPORT FMC RATES. THE 48 TFW (DEPLOYED) IS READY FOR 7 DAYS OF
HIGH INTENSITY SUSTAINED COMBAT OPS.
BT
#0119
NNNN
Document Page: First | Prev | Next | All | Image | This Release | Search