CRIITICAL EQUIPMENT STATUS - RAPID RUNWAY REPAIR
PRIMARY THREAT
LOCATION AIRCRAFT PRIORITY STATUS LIMFACS/COMMENTS
AL AYN C-l30
AL DHAFRA F-16
AL MINHAD F-16
BATEEN C-130
CAIRO KC-l35
DHAHRAN F-15 4 UNSAT SEE NOTE 1
[(b)(1)SEC3.4(b)(5)]
DOHA F-16 5 UNSAT SEE NOTE 1
JEDDAH KC-135
[(b)(1)SEC3.4(b)(5)]
K. FAHD A-10 1 UNSAT SEE NOTE 2
KHALID KC-135
MASIRAH C-l30
RIYADH E-3A
SEEB KC-135
SHAIKH ISA F-4G 2 UNSAT SEE NOTE 8
SHARJAH C-l30
TABUK F-15 3 UNSAT SEE NOTE 1
TAIF F-111
THUMRAIT F-15
NOTE 1: HEAVY EQUIPMENT SOURCED. LGT IS WORKING SHORTFALLS WITH HQ
TAC/LGT. AFESC IS WORKING FIBERGLASS MAT TO FILL SHORTFALL OF
AM-2 MAT SYSTEM. FIRST 2 KITS OF 4 PATCHES EXPECTED TO BE READY
FOR SHIPMENT ON 24 OCT 90. NO AM-2 AVAILABLE TO POSITION MATS AT
THESE LOCATIONS.
NOTE 2: AM-2 MAT SYSTEM ARRIVED 6 OCT 90. KITS MISSING PARTS. SITE
IS PEFORMING A DETAILED INVENTORY. NINE INCOMPLETE PATCHES ON
SITE BUT HEAVY EQUIPMENT STILL IN TRANSIT.
NOTE 3: 375 BUNDLES AM-2 MAT ON SITE BEING USED TO DISPERSE AIRCRAFT.
TOW TUBES, RAMPS, ETC., FOR NINE PATCHES ARRIVED 5 OCT 90.
HEAVY EQUIPMENT SOURCED BUT DUMP TRUCKS CURRENTLY BEING USED
AT AL DHAFRA TO BUILD MUNITIONS BERMS.
AS OF 20 OCT 90
OPR: [(b)(2)]