Document Page: First | Prev | Next | All | Image | This Release | Search

File: aaaui_27.txt
Page: 27
Total Pages: 34

         
         
         
         
                                           USCENTAF/DE
         
                                       CONSTRUCTION STATUS
         
OPR   PROJECT #      PROJECT TITLE            		STATUS          COMMENTS
         
         
BEEF  ALMI910001   CONSTR A/C APON/HOT PIT 	DESIGN    OUT FOR BID
BEEF  JEDD910001   CONSTR MUNITIONS BERMS   	DESIGN
BEEF  RIYA910004   CONN COMM PWR, COMPLEX   	DESIGN
BEEF  BIYA910005   INST ELECT PWR, ELF ONE  	DESIGN
BEEF  SHAI910002   CONNECT TO COMM POWER   	DESIGN
HORSE ALAI910002 CONDUCT UTILITY SURVEY   	DESIGN   EVALUATION BEING REVIEWED
HORSE ALDH910005 CONDUCT UTILITY SURVEY   	DESIGN    SURVEY SUBMITTED
HORSE ALKH910002 INSTALL SECURITY FENCE   	DESIGN    PREPARING FORM 9 FOR CTR INST
HORSE ALKH910003 UPGRADE KFAA DORMS       	DESIGN    FORM 9 FOR PARTS APPROVED
HORSE ALKH910004 CONSTR K-SPAN COV STG    	DESIGN
HORSE ALMI910006 INST A/C TIEDOWNS        		DESIGN    EVALUATION 23 OCTOBER
HORSE ALMI910011 CONDUCT UTILITY SURVEY   	DESIGN    SURVEY SUBMITTED
HORSE BATE910001 CONDUCT UTILITY SURVEY   	DESIGN    SURVEY SUBMITTED
HORSE KFIA910002 CONSTR 5000-MAN CANTON   	DESIGN    AWAITING APPROVAL OF CONCEPT
HORSE RIYA910003 CONN COMM PWR, ESKAN 9-1 	DESIGN    HN CONTRACTOR TO CONNECT
HORSE RIYA9l0006  CONN COMM PWR, TENT CITY 	DESIGN    HN CONTRACTOR TO CONNECT
HORSE RIYA910011 CONN COMM PWR, ATH       	DESIGN    HN CONTRACTOR TO CONNECT
HORSE RIYA910016 CONN COMM PWR, PMEL      	DESIGN    HN CONTRACTOR TO CONNECT
HORSE RIYA910020 CONSTR SHOPETTE, ESKAN  	DESIGN
HORSE RIYA91002S CONSTR BARBER SHP, ESKAN 	DESIGN
HORSE RIYA910034 CONN COMM POWER, RSAF    	DESIGN    DESIGN SUBMITTED
HORSE SEEB910002 CONDUCT UTILITY SURVEY   	DESIGN    SURVEY SUBMITTED
HORSE SEEB910003 PROVIDE DRAFT SPT, ATH  	DESIGN    PROVIDED TO SEEB/DE, 12 OCT
HORSE SHAB910001 CONDUCT UTILITY SURVEY  	DESIGN    SURVEY SUBMITTED
HORSE THUM910003 CONDUCT UTILITY SURVEY   	DESIGN    SURVEY SUBMITTED
MC        CAIR910001  CONSTR LATRINES          		DESIGN    ON HOLD
         
         
         
         
                                                         			AS OF 20 OCT 90
         							OPR:    [(b)(2)]

Document Page: First | Prev | Next | All | Image | This Release | Search