                                    USCENTAF/DE

                          POWER PLANTS - 750 KW GENERATORS

                  	SITE     		750 KW
  LOCATION     POPULATION  ON SITE    STATUS    LIMFACS/COMMENTS

	AL AYN	1300	5	SAT
	AL DHAFRA	3000	8	SAT
	AL KHARJ	4700	17	SAT		NOTE 1
	AL MINHAD	2600	5	SAT		NOTE : SUPPORTS ABU DHABI
	BATEEN	1200	4	SAT
	CAIRO		850	4	SAT		NOTE 2
	DHAHRAN	3500	3	SAT
	DOHA		1000	3	MAR
	JEDDAH	4050	0	SAT		NOTE 3
	KHAMIS	1350	0	SAT		NOT REQUIRED
	K. FAHD	5500	11	SAT		NOTE 4
	K. KHALID IAP 1700	0	MAR		NOTE 5
	KKMC		1350	3	SAT
	MASIRAH	1000	2	SAT
	RIYADH	6850	4	SAT
	SEEB		1200	2	SAT
	SHAIKH ISA	2600	5	SAT
	SHARJAH	750	2	MAR
	TABUK		1000	0	SAT			NOT REQUIRED
	TAIF		2750	8	SAT
	THUMRAIT	1350	7	SAT

	TOTAL		49600	93

GOAL:  CONNECT TO COMMERCIAL POWER.  RETAIN ORGANIC ASSETS FOR BACK-UP.

NOTE 1:  750KW SOLARS CLEANED BY CEMIRT.

NOTE 2:  BROKEN 750KW SHIPPED TO THUMRAIT FOR REPAIR.  FORTH UNIT NOW ON SITE
                AS BACK-UP.  TROUBLE WITH FAN BOLTS CONTINUES.

NOTE 3:  A MEP-7 SUPPORTING COMM OPS SHIPPED TO THUMRAIT
         	  FOR CEMIRT REPAIR OF LEAKING REAR ENGINE SEAL.  CEMIRT AWAITING PARTS

NOTE 4:  ONE 750KW AT THUMRAIT FOR REPAIRS.

NOTE 5:  SITE CURRENTLY OPERATING ON FIVE (MEP-6) GENERATORS AND ONE
	  COMMERCIALLY PURCHASED 25OKW GENERATOR.

ASSET SUMMARY:
	CEMIRT STILL AWAITING PARTS TO CONSTRUCT 220 LOW VOLTAGE POWER
	DISTRIBUTION PANELS.  ALL SDC'S USED AND MANY SITES HAVE NOW EXPANDED
	WITHOUT MEANS OF USING 4160 VOLT CURRENT.

                                                AS OF 26 JAN 91
                                                   [(b)(2)]