Document Page: First | Prev | Next | All | Image | This Release | Search
File: aaauk_14.txt
USCENTAF/DE
CRITICAL EQUIPMENT STATUS - RAPID RUNWAY REPAIR
(REQ VS ON-HAND)
PRIMARY FFGM AM -2
LOCATION AIRCRAFT PRIORITY STATUS REMARKS KITS BDLS
AL AYN C-130
AL DHAFRA F-16
AL KHARJ F-15/16 7 CONTINGENCY 1/0
SPARE
AL MINHAD F-16
BATEEN C-130
CAIRO KC-135
DHAHRAN F-15 4 SAT SEE NOTE 1/1 81/9
DOHA F-16 6 SAT 1/1 81/0
JEDDAH KC-135
[(b)(1)sec 3.4(b)(5)]
K. FAHD A-10 3 SAT 1/1 81/81
K. KHALID KC-135
KKMC A-10 2 MAR SEE NOTE 1/1 81/0
MASIRAH C-130
RIYADH E-3A
SEEB KC-135
SHAIKH ISA F-4G 1 SAT SEE NOTE 1/0 81/81
SHARJAH C-130
TABUK F-15 5 MAR SEE NOTE 1/1 0/0
TAIF F-lll
THUMRAIT F-15 8 CONTINGENCY 1/0
SPARE
NOTE: RRR HEAVY VEHICLES (FEL, DOZER, GRADER, EXCAVATOR, AND DUMPS) ARE
STILL A PROBLEM AT DHAHRAN AND KKMC. RENTALS ARE PROVIDING AN
INTERIM CAPABILITY AT THIS TIME. LGT IS DIVERTING SEVERAL DUE-IN
VEHICLES TO THESE LOCATIONS. KKMC HAS 25-PERSON RED HORSE
HORIZONTAL TEAM WITH HEAVY EQUIPMENT IN-PLACE, AND BETWEEN THEM
AND PRIME BEEF, RRR MANPOWER AND VEHICLE NEEDS SHOULD BE MET. DUE TO LIMITED MANPOWER AT TABUK, ONLY TWO CRATER TEAMS (INCLUDES HN
AUGMENTATION) CAN BE FIELDED; USAF CAN ONLY FIELD ONE TEAM W/OUT HN
AUGMENTATION. SECOND RED HORSE HORIZONTAL TEAM AVAILABLE TO
RESPOND IF REQUIRED. SHAIKH ISA FFGM AWAITING MOVEMENT FROM RIYADH
(EST DELIVERY 27 JAN). NINE INCH BOLTS AND POLYMER FOR KKMC AWAITING
AIRLIFT FROM RIYADH (EST DELIVERY 27 JAN).
AS OF 26 JAN 91
[(b)(2)]
Document Page: First | Prev | Next | All | Image | This Release | Search