Document Page: First | Prev | Next | All | Image | This Release | Search

File: aaaum_25.txt
Page: 25
Total Pages: 30

         
         Page No.     3
         
         11/09/90
         
         
         
         
         
         
                                       USCENTAF/DE
                                   CONSTRUCTION STATUS
         
    OPR  	PROJECT #  	PROJECT  TITLE            	STATUS	 %   	ESD  		ECD
         
			
HORSE 	DOHA910011	CONTTR MUNITIONS FACS (2) 	PLAN	000
HORSE 	DOHA910012	CONSTR WEATHER OPEN STG 	PLAN	000
HORSE 	DOHA910013	CONSTR WRSK STG K-SPAN	PLAN	000
HORSE	DOHA910013	MUNS STG FACS (2) 		PLAN	
HORSE	JEDD910002	CONDUCT UTILITY SURVEY 	PLAN	000    1105   1107
HORSE	KFIA910006	CONDUCT UTILITY SURVEY	DESIGN  090    1020   1019
HORSE	KFIA910008	SUPERVISE REVET ERECTION	PLAN	050     1208   0201
HORSE	KFIA910009	CONSTR MUNS STG FAC  (6)	PLAN	050     1208   0208
HORSE   KFIA910011	CONSTR MUNS STG FAC  (12)	PLAN                1208   0208 
HORSE	KFIA910012	CONSTR RATIONS STG FAC 	PLAN      050     1208   0208
HORSE	KFI910012	CONSTR COMMUNITY FACS	DESIGN   050			
HORSE	MASI91004	CONDUCT UTILITY SURVEY	PLAN	             1106    1104
HORSE   RIYA910003	CONN COMM PWR, ESKAN 9-1 	DESIGN	 100       0920   0925
HORSE   RIYA910006	CONN COMM PWR, TENT CITY	DESIGN   100      0920    0920
HORSE   RIYA910011 	CONN COMM PWR, ATH		DESIGN   100      1015    1016
HORSE   RIYA910016	CONN COMM PWR, PMEL		DESIGN   100      0927    0926
HORSE   RIYA910020	REHAB SHOPPETTE. ESKAN 	CONSTR   010  1030       1215
HORSE   RIYA910023 	REHAB BARBER SHOP,  ESKAN 	DESIGN	100
HORSE	RIYA910029	UPGRADE RH ESKAN VILLAS	CONSTR  090   1015        1115
HORSE  RIYA910032	DIG PIT FOR POL,  ESKAN		PLAN
HORSE  RIYA910033	CONSTR A/C PAD FOR AWACS	PLAN        100
HORSE  RIYA910034	UTILITY SURVEY,  RSAF		DESIGN    100   0927   0820
HORSE  RIYA910035	REHAB SNACK BAR,  ESKAN	PLAN   
HORSE  RIYA910038	CONSTR HELO LAND PAD, EV	PLAN 	050
HORSE	SEEB910002	CONDUCT UTILITY SURVEY	DESIGN  100 1012 1013
HORSE	SEEB910003	PROVIDE DRAFT SPT, ATH 	COMP     100 1012  1013
HORSE	SHAI910004	CONSTR MUNITIONS MODULES	PLAN      000   0422 0608
HORSE	SHAI910005	SUPERVISE REVET ERECTION	CONSTR  010 1103  0101
HORSE	SHAI910007	CONSTR WRSK K-SPAN 		PLAN	0101  0301
HORSE	SHAI910009	CONDUCT UTILITY SURVEY	DESIGN 	100 1019  1021
HORSE	SHAI910010	CONSTR MUNS STG FACS (2)	PLAN	000
HORSE  	SHAI910010	CONSTR COMMUNITY FACS	DESIGN 005	
HORSE 	SHAR910001	CONDUCT UTILITY SURVEY	DESIGN 100  1006  1007
HORSE	SHAR910002	SUPERVISE REVET ERECTION	PLAN	        0201  0401
HORSE 	TABU910001	CONSTR CRS FACILITY		PLAN	        0422  0622
HORSE	TABU910003	SUPERVISE REVET ERECTION	PLAN	        1208  0201
HORSE	TAIF910003	CONDUCT UTILITY SURVEY	DESIGN	100  1024  1025
HORSE	THUM910003	CONDUCT UTILITY SURVEY	DESIGN 100  1013  1014
HORSE	USAR910001	PAVE ASP ROADS, QUARRY	CONSTR 005 1030  0101
HORSE	USAR910002	CONSTR TACT PETROL TERMS	HOLD	 000  N/A N/A
HORSE 	USAR910003	CONSTR PAT BERMS, REFINE	CONSTR 050
HORSE 	USAR910004	CONSTR PATRIOT BERMS, KK	DESIGN	 100
HORSE	USAR910005	PAVE HELIPORT, VIC THADJ	HOLD	 000  N/A N/A
HORSE  	USAR910006	CONSTR AMMO SUP PTS, KFIA	HOLD	 100  N/A N/A
HORSE	USAR910007	CONST HELO LAND PAD, KFIA	PLAN
HORSE	USAR910008 	CONSTR APRON, FIXED/KFIA 	HOLD	         N/A N/A
HORSE	USAR910009	CONSTR PAT BERMS, RIY AB 	PLAN
HORSE	USAR910010	CONSTR HELO PAD, ESKAN	PLAN
				

         


Document Page: First | Prev | Next | All | Image | This Release | Search