(4) FIVE POWER PRO AND ONE HEAT TECHNICIAN. POWER
FLANT IS NOW OPERATION TENTY-FOUR HOUR PERDAY WITH ONLY
FOUR POWER PRODUCTION PERSONNEL ASSIGNED. WE HAVE NOT BEEN
ABLE TO CHECK OUT ALL PORTABLE GENERATORS AND IF A GENERATOR
BREAKS. OUR POWER PRODUCTION PERSONNEL WILL BE SERVERLY TAXED.
WITH REGARDS TO HEAT TECHNICIAN, WE CURRENTLY HAVE NONE ASSIGNED
BUT SITLL HAVE DIESEL FIRED BOILERS FOR SHOWERS AND DINING HALL.
(5) NOE 20K WATER BLADDER TO REPLACE LEAKING BLADDER.
(6) WE ARE MISSING MANY ELECTRICAL PARTS FOR OUR TEMPTER TENTS.
WE NEED 17 SETS OF ELECTRICAL PARTS TO PROVIDE POWER TO OUR
ERECTED TENTS, PARTS ON ORDER.
(7) 21 MORE AIR CONDITIONERS/HEATERS TO FINISH OUR TENT
CITY. ALSO REQUEST AN ADDITIONAL 9 A/C AND HEATER UNITS TO
AIR CONDITION CRITICAL OPERATIONAL AREAS HOUSED IN OLD AIRCRAFT
BUNKERS. AWAITING SOURCING FROM CENTAF.
PAGEE 05 RHIDFK0254
(8) 2 SEWER TRUCKS, 15 PORTABLE LATRINES, 1 WATER TRUCK
AND 1 DEISEL FUEL TRUCK.
(9) 24 VOLT GENERATORS FOR PLASI. SOURCED AWAITING EDD.
(10) 5O EA BLUE TAXIWAY GLOBES.
(11) NEED ONE TEMPTER TENT AND A/C UNIT FOR PORTABLE TACAN. THIS
IS AN SC REQUIREMENT.
J. LIMFACS: NONE AT THIS TIME; HOWEVER, ITEMS
1,2,4 ABOVE COULD BECOME CRITICAL IF CURRENT SITUATION CHANGES
AND ITEM 7 WILL BECOME CRITICAL IF ADDITIONAL PERSONNEL ARE
ASSIGNED TO SITE.
2. (U) FIRE PROTECTION
A. FIREFIGHTERS
ASSIGNED: 48
PROJECTED: 0
B. VEHICLES: 4 EA P-4'S 1 EA P-l9B, P-13, P-20.
STATUS: 1 EA P-4 OUT-OF-SERVICE (ALTERNATOR)
P-20, NO RESERVICING CAPABILITY. HAVE SOURCED KIT
AWAITING TRANSPORTATION.
C. (U) EQUIPMENT/SUPPLIES
(1) FILGHTLINE EXTINGUISHERS: 14 EA, 150 LBS
(2) AFFF: 2465 GALS