Document Page: First | Prev | Next | All | Image | This Release | Search

File: aaavx_16.txt
Page: 16
Total Pages: 32

         
                                         USCENTAF/DE
         
                       CRITICAL EQUIPMENT STATUS - RAPID RUNWAY REPAIR
         
         
(REQ VS ON-HAND)
		PRIMARY 							FFGM	AM-2
LOCATION 	AIRCRAFT 	PRIORITY 	STATUS 	REMARKS 	KITS	BDLS
 
AL AYN 	C-130
AL DHAFRA 	F-16
AL KHARJ 	F-15/16 						CONTINGENCY 1/0
								SPARE
AL MINHAD 	F-16
BATEEN    	C-130
CAIRO     	KC-135
DHAHRAN   	F-15        	4     		MAR    		NOTES 2 + 5 	l/0    81/9
DOHA      	F-16        	6     		MAR    		NOTES 5     	1/1    81/0
JEDDAH    	KC-135
[(b)(l)sec 3.4 (b)(5)]
K. FAHD 	A-lO         	 3     		SAT    		NOTES 3 + 5 	l/0    81/81
K. KHALID 	KC-135
KKMC      	NONE       	2     		UNSAT 	NOTES 1 + 5 	l/0     81/0
MASIRAH   	C-130
RIYADH    	E-3A
SEEB      	KC-135
SHAIKH ISA  	F-4G   		1      		MAR        	NOTES 5  	1/0   81/81
SKARJAH   	C-130
TABUK     	F-15        	5     		MAR    		NOTES 4 + 5       1/2   0/0
TAIF      	F-lll
THUMRAIT  	F-15						CONTINGENCY 1/0
								SPARE
         
NOTE 1:  NEW REQUIREMENT.  THIS BASE IS CURRENTLY SCHEDULED TO GET
         TRANSIENT MAC FLIGHTS AND FUNCTION AS AN FOL FOR A-lO AIRCRAFT.
         MAY ALSO BE USED AS AN ALTERNATE RECOVERY BASE FOR FIGHTER
         AIRCRAFT SINCE SITE IS NEAR KUWAIT BORDER,  THE FFGM KIT NOW
         POSITIONED AT RIYAD, AND ORIGINALLY PROGRAMMED FOR DOHA.  IS
         AWAITING TRANSPORT TO KKMC (ESD:  25 DEC 90).
         (ESD:  25 DEC 90).
         
NOTE 2:  TWO FFGM KITS (EACH KIT HAS FOUR 54 X 60 FT PATCHES) SHIPPED FROM
         CONUS ON 24 OCT 90 AND ARRIVED AT TABUK.  ONE KIT PROGRAMMED TO
         MOVE FROM TABUK TO DHAHRAN BUT AWAITING TRANSPORTATION.  BRITISH
         ROLLED MAT SYSTEM AVAILABLE BUT US BCE PERSONNEL NOT TRAINED TO
         USE.
         
NOTE 3:  AM-2 MAT SYSTEM MISSING 6-6 FOOT KEY LOCKS (5680-00-132-1730) AND
         32 GREEN AND 64 RED LIGHT MARXER LENSES (6210-00-548-0129); ITEMS
         ORDERED THROUGH LOCAL LGS.
         
NOTE 4:  TWO FFGM KITS ARRIVED 6 NOV 90 WITH ONE KIT PROGRAMMED FOR
         SHIPMENT TO DHAHRAN.  BRITISH ROLLED MAT SYSTEM AVAILABLE; US BCE
         PERSONNEL HAVE HAD LIMITED TRAINING.
         
NOTE 5:  ALL PRIORITY LOCATIONS WILL HAVE THEIR COMPLEMENT OF RRR VEHICLES
         

Document Page: First | Prev | Next | All | Image | This Release | Search