Document Page: First | Prev | Next | All | Image | This Release | Search

File: aaawk_15.txt
Page: 15
Total Pages: 31

USCENTAF/DE
CRITICAL EQUIPMENT STATUS - BARRIERS

		PRIMARY 	OPERATIONAL
LOCATION	AIRCRAFT 	BARRIERS	STATUS 	LIMFACS/COMMENTS

 AL AYN	C-130				SAT		1 REQ'D ALT RECOVERY
AL DHAFRA	F-16		(2) 61QSll	UNSAT		BAK-12 O/H, AWT HN APRVL
AL KHAR]	F-15/16		(2)BAK 9/14	SAT		POTENTIAL BARRIER REQ'D
AL MINHAD	F-16		MAAS		SAT		RQST'D PARTS TO MAKE
								BI-DIR
BATEEN	C-130				SAT		1 REQ'D ALT RECOVERY
CAIRO		KC-135		(2) BAK14	SAT		PENDING INSPECTION
DHAHRAN	F-15		(2) BAK14	SAT
DOHA		F-16 				UNSAT 	BAK-12, MAAS O/H,
								OBTAINED HN APPROVAL,
								NOW AWAITING PARTS
JEDDAH	KC-135 				SAT
KHAMIS	[(b)(1)sec.3.4(b)(5)] (2) BAK12/14 SAT		1 REQ'D ALT RECOVERY
K. FAHD	A-10 				SAT		MAAS O/H, BAK-12 SOURCED
K. KHALID	KC-135	 			SAT
MASIRAH	C-130 		(4) 44B-2P/	SAT
				MK6
RIYADH	E-3A MAAS			SAT
SEEB		KC-135				SAT
SHAIKH	F-4G BAK12/14			SAT
SHARJAH	C-130				SAT		1 REQ'D ALT RECOVERY
TABUK		F-15	 	(2) BAK 13/ 	SAT		2 BRITISH PORTA-RESTS
				14, (2) BAK			O/H
				12/14
TAIF		F-111		 (4) BAK14 	SAT		BAK12 INSTALLED
				WITH B4AA
				500 ARRESTING
				GEAR
THUMRAIT	F-15	 (2) WATER		 SAT		MAAS PENDING
			TWISTERS				INSTALLATION

GOAL: TO PREPOSITION A MAAS OR BAK-12 AT EACH FORWARD SITE FOR
POTENTIAL AIRCRAFT RECOVERY.

ASSET SUMMARY:
HARVEST FALCON IN AF INVENTORY: UNK
HARVEST FALCON IN PREPO ON 7 AUG 90: UNK
HARVEST FALCON SHIPPED FROM CONUS: UNK
								AS OF 24 NOV 90
                                               					OPR: [(b)(2)]

Document Page: First | Prev | Next | All | Image | This Release | Search