CRITICAL EQUIPMENT STATUS - RAPID RUNWAY REPAIR

		PRIMARY 	THREAT
LOCATION 	AIRCRAFT 	PRIORITY 	STATUS 	LIMFACS/COMMENTS

AL AYN	C-130
AL DHAFRA 	F-16
AL KHARJ
AL MINHAD 	F-16
BATEEN	C-130
CAIRO		KC-135
DHAHRAN	F-15		4		UNSAT 	SEE NOTE 1
DOHA		F-16		3		UNSAT 	SEE NOTE 2
JEDDAH	KC-135
KHAMIS [(b)(l)sec.3.4 (b)(5)]
K. FAHD 	A-10		1		UNSAT 	SEE NOTE 3
KHALID 	KC-135
MASIRAH 	C-130
RIYADH 	E-3A
SEEB 		KC-135
SHAIKH ISA 	F-4G		2		UNSAT 	SEE NOTE 4
SHARJAH 	C-130
TABUK 	F-15		5		UNSAT 	SEE NOTE 5
TAIF 		F-111
THUMRAIT 	F-15

NOTE 1: HEAVY EQUIPMENT SOURCED. LGT IS WORKING SHORTFALLS WITH HQ
TAC/LGT. AFESC IS WORKING FIBERGLASS MAT TO FILL SHORTFALL OF
AM-2 MAT SYSTEM. FOUR PATCHES (FIBERGLASS) MAT RIT SHIPPED FROM
CONUS ON 24 OCT 90 AND ARRIVED AT TABUK. ASSETS BEING MOVED FROM
TABUK TO DHAHRAN.

NOTE 2: LG WORKING SHORTFALL OF VEHICLES FROM CONUS. NO AM-2 MAT SYSTEM
AVAILABLE FOR THIS SITE. SITE SCHEDULED FOR NEXT AVAILABLE FIBER-
GLASS MAT SET CURRENTLY BEING PRODUCED.

NOTE 3: AM-2 MAT SYSTEM ARRIVED 6 OCT 90. KITS MISSING PARTS. SITE
PERFORMED A DETAILED INVENTORY AND LISTED SHORTFALLS IN THEIR
SITREP. NINE INCOMPLETE PATCHES ON SITE BUT HEAVY EQUIPMENT STILL
IN TRANSIT. THERE IS STILL A SERIOUS SHORTFALL OF HEAVY EQUIPMENT
TO PERFORM RRR.

NOTE 4: 375 BUNDLES AM-2 MAT ON SITE BEING USED TO DISPERSE AIRCRAFT.
TOW TUBES, RAMPS, ETC., FOR NINE PATCHES ARRIVED 5 OCT 90.
HEAVY EQUIPMENT SOURCED BUT DUMP TRUCKS CURRENTLY BEING USED AT
AL DHAFRA TO BUILD MUNITIONS BERMS. PATCH KITS INVENTORIED AND
FOUND TO BE COMPLETE

NOTE 5: SHORTFALL OF HEAVY EQUIPMENT IDENTIFIED TO LGT. TWO FOLDED
FIBERGLASS PATCH KITS ARRIVED 6 NOV 90 AND ONE KIT BEING SHIPPED
TO DHAHRAN.
							AS OF 24 NOV 90
							OPR: [(b)(2)]