Document Page: First | Prev | Next | All | Image | This Release | Search
File: aaawk_17.txtUSCENTAF/DE CRITICAL EQUIPMENT STATUS - RAPID RUNWAY REPAIR PRIMARY THREAT LOCATION AIRCRAFT PRIORITY STATUS LIMFACS/COMMENTS AL AYN C-130 AL DHAFRA F-16 AL KHARJ AL MINHAD F-16 BATEEN C-130 CAIRO KC-135 DHAHRAN F-15 4 UNSAT SEE NOTE 1 DOHA F-16 3 UNSAT SEE NOTE 2 JEDDAH KC-135 KHAMIS [(b)(l)sec.3.4 (b)(5)] K. FAHD A-10 1 UNSAT SEE NOTE 3 KHALID KC-135 MASIRAH C-130 RIYADH E-3A SEEB KC-135 SHAIKH ISA F-4G 2 UNSAT SEE NOTE 4 SHARJAH C-130 TABUK F-15 5 UNSAT SEE NOTE 5 TAIF F-111 THUMRAIT F-15 NOTE 1: HEAVY EQUIPMENT SOURCED. LGT IS WORKING SHORTFALLS WITH HQ TAC/LGT. AFESC IS WORKING FIBERGLASS MAT TO FILL SHORTFALL OF AM-2 MAT SYSTEM. FOUR PATCHES (FIBERGLASS) MAT RIT SHIPPED FROM CONUS ON 24 OCT 90 AND ARRIVED AT TABUK. ASSETS BEING MOVED FROM TABUK TO DHAHRAN. NOTE 2: LG WORKING SHORTFALL OF VEHICLES FROM CONUS. NO AM-2 MAT SYSTEM AVAILABLE FOR THIS SITE. SITE SCHEDULED FOR NEXT AVAILABLE FIBER- GLASS MAT SET CURRENTLY BEING PRODUCED. NOTE 3: AM-2 MAT SYSTEM ARRIVED 6 OCT 90. KITS MISSING PARTS. SITE PERFORMED A DETAILED INVENTORY AND LISTED SHORTFALLS IN THEIR SITREP. NINE INCOMPLETE PATCHES ON SITE BUT HEAVY EQUIPMENT STILL IN TRANSIT. THERE IS STILL A SERIOUS SHORTFALL OF HEAVY EQUIPMENT TO PERFORM RRR. NOTE 4: 375 BUNDLES AM-2 MAT ON SITE BEING USED TO DISPERSE AIRCRAFT. TOW TUBES, RAMPS, ETC., FOR NINE PATCHES ARRIVED 5 OCT 90. HEAVY EQUIPMENT SOURCED BUT DUMP TRUCKS CURRENTLY BEING USED AT AL DHAFRA TO BUILD MUNITIONS BERMS. PATCH KITS INVENTORIED AND FOUND TO BE COMPLETE NOTE 5: SHORTFALL OF HEAVY EQUIPMENT IDENTIFIED TO LGT. TWO FOLDED FIBERGLASS PATCH KITS ARRIVED 6 NOV 90 AND ONE KIT BEING SHIPPED TO DHAHRAN. AS OF 24 NOV 90 OPR: [(b)(2)]
Document Page: First | Prev | Next | All | Image | This Release | Search