			POWER PLANTS - 750 KW GENERATORS  
  
		ELEC ASSETS 	750 KW  
LOCATION	FOR POP OF 	ON SITE	STATUS		LIMFACS/COMMENTS  
  
AL AYN	1200		4 		SAT  
AL DHAFRA	2500		8 		SAT  
AL KHARJ	4400		6 		SAT			NOTE 1  
AL MINHAD	  950		3 		SAT			NOTE 2  
BATEEN	1100		4 		SAT  
CAIRO		1100		4 		SAT  
DHAHRAN	1200		3 		SAT  
DOHA		1000		3		 SAT  
JEDDAH	      0		0 		SAT			NOTE 3  
KHAMIS	      0		0 		SAT			NOT REQUIRED  
K. FAHD	4400	            11 		SAT  
K. KHALID IAP   400		0 		MAR			NOTE 4  
KKMC		  600		3 		SAT  
MASIRAH	1000		2 		SAT	  
RIYADH	  850		4 		SAT  
SEEB		1500		2 		SAT  
SHAIKH ISA	1500		5 		SAT  
SHARJAH	  400		2 		SAT  
TABUK		      0		0 		SAT		NOT REQUIRED  
TAIF		1150		8 		SAT  
THUMRAIT	2650		7 		SAT  
	  
TOTAL	             29330		70  
  
GOAL: CONNECT TO COMMERCIAL POWER.  RETAIN ORGANIC ASSETS FOR BACK-UP.  
  
NOTE 1:  POWER PLANT WENT ON-LINE 13 DECEMBER 1990.  
  
NOTE 2:  SITE PURCHASED STEEL TANK TO FILL REQUIREMENT OF SHORTFALLED 10K  
	  BLADDER.  
  
NOTE 3:  AIR TRANSPORTABLE HOSPITAL (ATH) AT THIS SITE ARRIVED WITH TWO INOP  
100KW (MEP-7B) GENERATORS.    THESE GENERATORS ARE BRAND NEW AND HAVE  
BEEN PULLED FROM THEIR FACTORY SHIPPING CONTAINERS AND WILL NOT  
OPERATE.   SO FAR CEMIRT HAS BEEN TO EACH SITE WHERE THESE GENERATORS  
HAVE BEEN DEPLOYED TO FIX THEM.   THIS SITE HAS ELECTED TO KEEP THEIR  
ATH AND AEROMEDICAL STAGING FACILITY (ASF) ON TACTICAL GENERATOR UNTIL  
THEY CAN CONNECT TO COMMERCIAL  POWER.   ALSO, A MEP-7 SUPPORTING COMM  
OPS FOR THE SITE IS BEING SHIPPED TO THUMRAIT FOR CEMIRT REPAIR OF  
LEAKING REAR ENGINE SEAL.