NOTE 5: LGT WORKING TO CORRECT SHORTAGE OF RRR VEHICLES. MAJOR ITEMS  
	INCLUDE EXCAVATORS, 8 CY DUMPS, 4 CY FELs, TRAILERS, VIBRATORY  
	ROLLERS, AND DOZERS. ALL PRIORITY LOCATIONS WILL HAVE  
	THEIR COMPLEMENT OF RRR VEHICLES (EXCEPT 3 FELs) TO  
	PERFORM AT THE R-1 LEVEL ON APPROXIMATELY 20 JAN 90.  
	THE EXCEPTION IS KKMC AND CENTAF/LGT IS NOW WORKING TO  
	FIX. SHIPMENT OF FFGMS WILL OCCUR WHEN PRODUCED BY AFESC AND IN  
	PRIORITY ORDER. ALSO, FOUR MATS EACH WILL BE STAGED AT AL KHARJ  
	AND THUMRAIT AND CONSIDERED CONTINGENCY WRSK FOR PRIORITY  
	LOCATIONS. 151 PRIME BEEF PERSONNEL FROM BATEEN, KING FAHD, KKI,  
	DHAHRAN, DOHA, RIYADH, SHAIKH ISA, AND TABUK HAVE BEEN TRAINED ON  
	THE FFGM SYSTEM AND USING THE PYRAMENT SAC-PAC SPALL REPAIR  
	MATERIAL.  
  
	  
							AS OF 15 DEC 90  