Document Page: First | Prev | Next | All | Image | This Release | Search
File: aaawp_17.txtUSCENTAF/DE CRITICAL EQUIPMENT STATUS - RAPID RUNWAY REPAIR PRIMARY THREAT LOCATION AIRCRAFT PRIORITY STATUS LIMFACS/COMMENTS AL AYN C-130 AL DHAFRA F-l6 AL MINHAD F-16 BATEEN C-130 CAIRO KC-135 DHAHRAN F-15 4 UNSAT SEE NOTE 1 DIEGO [(b)(1)SEC 3.4(b)(5)] DOHA F-l6 5 UNSAT SEE NOTE 1 JEDDAH KC-135 KHAMIS [(b)(1)SEC 3.4(b)(5)] K. FAHD A-10 1 UNSAT SEE NOTE 2 KHALID KC-135 HASIRAH C-130 - RIYADH E-3A SEEB KC-135 SHAIKH ISA F-4G 2 UNSAT SEE NOTE 3 SHARJAH C-130 TABUK F- 15 3 UNSAT SEE NOTE 1 TAIF F-111 THUMRAIT F-15 NOTE 1: HEAVY EQUIPMENT SOURCED. LGT IS WORKING SHORTFALLS WITH HQ TAC/LGT. NEED FIBERGLASS MAT TO FILL SHORTFALL OF AM-2 MAT SYSTEM. NO AM-2 AVAILABLE TO POSITION MATS AT THESE LOCATIONS. NOTE 2: AH-2 MAT SYSTEM ARRIVED 6 OCT 90. NINE PATCHES ON SITE BUT HEAVY EQUIPMENT STILL IN TRANSIT. NOTE 3: 375 BUNDLES AM-2 HAT ON SITE BEING USED TO DISPERSE AIRCRAFT. TOW TUBES, RAMPS, ETC., FOR NINE PATCHES ARRIVED 5 OCT 90. HEAVY EQUIPMENT SOURCED BUT DUMP TRUCKS CURRENTLY BEING USED AT AL DHAFRA TO BUILD MUNITIONS BERMS. AS OF 6 OCT 90 OPR: [(b)(2)]
Document Page: First | Prev | Next | All | Image | This Release | Search