POWER PLANTS - 750 KW GENERATORS

			SITE 		750 KW
LOCATION		POPULATION 	ON SITE	STATUS	LIMFACS/COMMENTS

[(b)(l)sec3.4 (b)(5)	1600		5		SAT		
			2850		8 		SAT		NOTE 1
			4400		17 		SAT		NOTE 2
			2500		5		SAT
			1100		4 		SAT
			850		4 		SAT		NOTE 3
			3500		3 		SAT
			950		3 		MAR
			3200		0 		SAT		NOTE 4
			1300		0 		SAT		NOT REQUIRED
			5200		11		SAT		NOTE 5
			1550		0 		MAR		NOTE 6
			1000		3 		SAT
			950		2 		SAT
			5550		4 		SAT
			800		2 		SAT
			2400		5 		SAT
			750		2 		MAR
			850		0 		SAT		NOT REQUIRED
			2600		8 		SAT
[(b)(l)sec3.4 (b)(5)	1300		7 		SAT

TOTAL			45200		93

GOAL: CONNECT TO COMMERCIAL POWER. RETAIN ORGANIC ASSETS FOR BACK-UP.

NOTE 1: SITE NOW SUPPORTING PLUS-UPS FOR MISSION AT[(b)(l)sec3.4 (b)(5) 

NOTE 2: REMAINING 2 INOP 750'S TO BE SHIPPED TO THUMRAIT FOR REPAIR. CEMIRT
ATTEMPTED TO PERFORM CLEANING MAINTENANCE OF UNITS BUT ALL WATER WASH SYSTEMS
WERE INOP DUE TO LACK OF PROPER MAINTENANCE WHILE THEY WERE PREPO' D.
INSTRUCTED SITE PERSONNEL ON WORK AROUND CLEANING METHOD. ALSO DELIVERED MEP-6
AND 7 SPARE PARTS.

NOTE 3: BROKEN 750KW SHIPPED TO THUMRAIT FOR REPAIR. A FORTH UNIT NOW ON SITE
	  AS BACK-UP. CEMIRT SHIPPED A FUEL MANIFOLD FROM THUMRAIT TO REPAIR
	  4TH 750.

NOTE 4:  A MEP-7 SUPPORTING COMM OPS FOR THE SITE WAS SHIPPED TO THUMRAIT
	   FOR CEMIRT REPAIR OF LEAKING REAR ENGINE SEAL. CEMIRT AWAITING PARTS
	   OPERFORM REPAIRS.

NOTE 5:  ONE 750KW AT THUMRAIT FOR REPAIRS.

NOTE 6:   SITE CURRENTLY OPERATING ON FIVE (MEP-6) GENERATORS AND ONE
	    COMMERCIALLY PURCHASED 250KW GENERATOR. ALL ASSETS OPERATING
	    MARGINALLY.

ASSET SUMMARY:
         FIRST FIVE ULN'S FROM EUROPE CONTAINING MEP 4/5/6'S ARRIVED THUMRAIT. TEN

Document Page: First | Prev | Next | All | Image | This Release | Search