USCENTAF FWD/DE
POWER PLANTS - 750 KW GENERATORS
SITE 750 KW
LOCATION POPULATION ON SITE STATUS LIMFACS/COMMENTS
AL AYN 1650 5 SAT NOTE 1
AL DHAFRA 3000 8 SAT SUPPORTS ABU DHABI
AL JAWF 650 0 SAT NOTE 2
AL KBAR] 4900 15 SAT NOTE 3
AL MINHAD 2650 4 SAT SUPPORTS ABU DHABI, NOTE 4
BATEEN 1200 4 SAT
CAIRO 900 4 SAT NOTE 5
DHAHRAN 3450 3 SAT
DOHA 1000 3 SAT
JEDDAH 4100 0 SAT NOTE 6
KHAMIS 1450 0 SAT NONE REQUIRED
K.FAHD 7000 11 SAT NOTE 7
K.KHALID 1750 0 MAR NOTE B
KKMC l800 4 SAT NOTE 9
MASIRAH 1000 3 SAT
RIYADH 8000 4 SAT
SEEB 1300 2 SAT
SHAIKH ISA 2700 6 SAT NOTE 10
SKARJAH 800 2 SAT
TABUK 1000 0 MAR NOTE 11
TAIF 2750 8 SAT
THUMRAIT 1600 7 SAT
TOTAL 54650 96
GOAL: CONNECT TO COMMERCIAL POWER. RETAIN ORGANIC ASSETS FOR BACK-UP.
NOTE 1: ONE 750KW DOWN FOR CYLINDER LOG.
NOTE 2: HN POWER PRDVIDED IN HARD BILLETS. MEP-6 GENERATORS TO SUPPLY POWER
TO MKT OPERATIONS. SHIPPED MEP-6 TO'S TO SITE. LGS WORKING TO
SUPPLY MEP-6 W2SK'S.
NOTE 3: 2 DOWNED 750KW SOLARS AT THUMRAIT WITH CEMIRT FOR REPAIRS. ONE
SOLAR DAMAGED BY FIRE TO BE SHIPPED TO THUMRAIT AS PARTS.CEMIRT VISITED
SITE THIS WEEK AND SOLVED MANY SMALL PROBLEMS.
NOTE 4: ONE BROKEN 750KW SHIPPED TO THUMRAIT FOR REPAIR. SITE ABLE TO MEET
CURRENT DEMAND.
NOTE 5: ONE UNIT DOWN FOR FAN HUB ASSEMBLY. NEED FAN ASSEMBLY. NOW AT
TORREJON AWAITING AIRLIFT.