Document Page: First | Prev | Next | All | Image | This Release | Search

File: aaaws_21.txt
Page: 21
Total Pages: 32

USCENTAF/ DE 
 
CRITICAL EQUIPMENT STATUS - ROWPU'S 
 
			SITE 
LOCATION		POPULATION		FMC	PMC	LIMFACS/COMMENTS 
 
AL AYN			1650				1 
AL DHAFRA		3000			1 
AL JAWF		650 
AL KHARJ		4900			3 
AL MINHAD		2650			3	1 
BATEEN			1200			1 
CAIRO			900			1 
DHAHRAN		3450			2		1 O/H AWT CHEM FEED PUMP 
DOHA			1000				1 
JEDDAH			4100					1 O/H AWT GENERATOR 
KHAM1S			1450 
K. FAHD		7000			5 
K. KHALID		l800 
KKMC			1650					1 O/H WITH MULTIPLE 
								PROBLEMS 
MASIRAH		1000			2 
RIYADH			8000			1 
SEEB			1300 
SHAIKH ISA		2700			3			1 O/H AWT RO PUMP 
SHARJAH		800			1 
TABUK			1000			1	1		1 O/H AWT H.P. 
ELBOW 
TAIF			2750			2 
THUMRAIT		1600	_		1			- 
 
TOTAL			54650			26	5		5 
 
1 ROWPU AT PREPO FOR PLACEMENT AS REQUIRED. 1 ADDlTlONAL UNIT WILL 
ARRIVE VIA SHIP DESTINED FOR THUMRAIT PREPO. RED HORSE HAS TWO ROWPUS 
O/H FOR FUTURE MISSION USE, ONE OPERATIONAL ROWPU BEING SHIPPED TO KKMC 
FROM MASIRAH. 500 ADDITIONAL R.O. CARTRIDGE FILTERS HAVE ARRIVED AND 
ARE BEING DISBURSED TO FIELD UNITS. WRSK KITS SHIPPED TO BASES DID NOT 
CONTAIN ALL NEEDED PARTS. 
 
FMC: ON LINE AND ABLE TO PRODUCE WATER. 
PMC: ON LINE BUT UNABLE TO PRODUCE WATER DUE TO LACK OF CHEMICALS. 
 
ASSET SUMMARY: 
HARVEST FALCON IN AF INVENTORY: UNK 
HARVEST FALCON IN PREPO ON 7 AUG 90: UNK 
HARVEST FALCON SHIPPED FROM CONUS: UNK 
 
AS OF 16 FEB 91 
[(b)(2)]

Document Page: First | Prev | Next | All | Image | This Release | Search