File: aaaws_30.txt20. KKMC 91-002A (AF 740 Construct A-10 ICT Area, King Khalid Military City, SA. - Scope: Construct asphalt A-10 aircraft integrated combat turn and maintenance area parallel to existing taxiway KKMC 91-0002 was 100' x 1000', KKMC 91-002A increased scope to two 190'x1000' pads. Funded Cost: $360.9K Unfunded Cost: $40.0K Total Cost: $400.9K Labor: Contract materials, US Army labor, RED HORSE. Funding Source: Saudi ASD: 8 Jan 91 ECD: 21 Feb 91 Status: 80%, complete. RH BDR team continuing work abandoned by contractor. Site POC: [(B)(2)] 21. KKMC 91-0003 (AF 741), Erect Aircraft Revetments, King Khalid Military City, SA - Scope: Erect and fill 8 B-1 aircraft revetments, rent eguip. Fnded Cost: $18.3K Unfunded Cost: $30.0K Total Cost: $48.3K Labor: Military (RED HORSE supervisor) Fnding Source: Saudi ESD: 15 Jan 91 ECD: 28 Feb 91 Status: 35%, complete. Materials and Equipment delivered. Awaiting additional revetments. Site POC:[(B)(2)] Riyadh MODA POC:[(B)(2)] 22. RIYA 91-0041 (AF 766) Construct one K-span for Comm Maint/Storage, Riyadh, S.A. I - Scope: Construct 50' x 100' K-Span for communications Maintenance/storage. Fence with gate by contract. Funded Cost: $67.2K Unfunded Cost: $55.9K Total Cost: $123.1K Funding Source: Saudi ESD: 6 Feb 91 ECD: 15 Mar 9l Status: 50%, complete. Fence request to Saudis 11 Feb 91. Site POC:[(B)(2)] 23. SHAI 91-0010 (AF 000), Construct 2 K-Span Munitions Storage, Shaikh a AB, Bahrain - Scope: Construct 2 K-Span munitions storage facilities. Funded Cost: TBD Unfunded Cost: TBD Total Cost: TBD Funding Source: TBD ESD: TBD ECD: TBD Status: -Canceled by user per RH, 15 Feb 91.
Document Page: First | Prev | Next | All | Image | This Release | Search