11 13  081620Z	DEC	90	PP		CC081920L


GALLON BLADDERS TO THEIR HELIPORT WHICH DID NOT OBTAIN [(b)(l)sec3.4(b)(6)]
			. .
	[(b)(l) sec 3.4 (b)(6)] 		WE WILL BE REQUIRED TO

RECONFIGURE A R-9 REFEULER TO JA1 TO SUPPORT THEIR OPERATION. THE

NAVY IS LOOKING AT PLACING A LARGE TANK TRAILER AT THIS LOCATION TO

BE THE SOURCE OF JA1 HOT/COLD PIT REFEULING OPERATION. IF THIS

OPTION IS NOT SUPPORTABLE. WE WILL REQUIRE TWO ADDITIONAL R-9S.

6. 		COMMUNICATIONS AND CONNECTIVITY.

A. SIGNIFICANT OUTAGES: NONE.

B. INCOMPATIBILITIES: NONE.

C. QUANTITATIVE EQUIPMENT DEFICIENCIES:	[(b)(1)sec3.4(b)(5)]



D. TRAFFIC VOLUME:

{1} SENT: FLASH 0, IMMEDIATE 0. PRIORITY 62, ROUTINE 42.

{2} RECEIVED: FLASH 3, IMMEDIATE 607, PRIORITY 142, ROUTINE 122.

{3} BACKLOG: O.

{4} TOTAL: 968, SENT 104, RECEIVED 864.

{5} AVG HANDLING TIME: FLASH N/A, IMMEDIATE N/A, [(b)(1)sec3.4(b)(5)] 

E. TELEPHONE CALLS:

{1} TTC-39A {24 - 30 NOV 90} OPERATOR ASSISTED.	ATTEMPTED:	2,106,






RNP