11 13 081620Z DEC 90 PP CC081920L
GALLON BLADDERS TO THEIR HELIPORT WHICH DID NOT OBTAIN [(b)(l)sec3.4(b)(6)]
. .
[(b)(l) sec 3.4 (b)(6)] WE WILL BE REQUIRED TO
RECONFIGURE A R-9 REFEULER TO JA1 TO SUPPORT THEIR OPERATION. THE
NAVY IS LOOKING AT PLACING A LARGE TANK TRAILER AT THIS LOCATION TO
BE THE SOURCE OF JA1 HOT/COLD PIT REFEULING OPERATION. IF THIS
OPTION IS NOT SUPPORTABLE. WE WILL REQUIRE TWO ADDITIONAL R-9S.
6. COMMUNICATIONS AND CONNECTIVITY.
A. SIGNIFICANT OUTAGES: NONE.
B. INCOMPATIBILITIES: NONE.
C. QUANTITATIVE EQUIPMENT DEFICIENCIES: [(b)(1)sec3.4(b)(5)]
D. TRAFFIC VOLUME:
{1} SENT: FLASH 0, IMMEDIATE 0. PRIORITY 62, ROUTINE 42.
{2} RECEIVED: FLASH 3, IMMEDIATE 607, PRIORITY 142, ROUTINE 122.
{3} BACKLOG: O.
{4} TOTAL: 968, SENT 104, RECEIVED 864.
{5} AVG HANDLING TIME: FLASH N/A, IMMEDIATE N/A, [(b)(1)sec3.4(b)(5)]
E. TELEPHONE CALLS:
{1} TTC-39A {24 - 30 NOV 90} OPERATOR ASSISTED. ATTEMPTED: 2,106,
RNP