TFW REQUESTS-6 ADDITIONAL QRC 80-01 EMC PODS TO SUPPORT BOTH
63 TFW AND 117 TRW. THE 363 TFW PLANS DAILY RAMP CHECKS ON ALERT
AIRCRAFT PODS AND WEEKLY ON REMAINING. IN LIGHT OF FAILURES,
IDENTIFIED BY EW AGGRESSOR TEAM, NEED FOR ADDITIONAL PODS EXISTS.
REQUST EXPEDITED SHIPMENT ON PODS. ALSO, REQUEST ONE ECM POD RAMP
ESTER REMAIN WITH 363 TFW AT COMPLETION OF EW AGGRESSOR VISIT.
SUPPLY: MICAP'S FOR NMCS AIRCRAFT TOTAL 323. ALL MULTIPLE
IT AND BACK-ORDERED STATUS MICAP'S WERE FAXED TO TAC TODAY FOR
FURTHER MAJCOM DISTRIBUTION. MULTIPLE HIT ITEMS DO NOT ALL HAVE BAD
STATUS. HOWEVER, THEY WERE LISTED TO SHOW TRENDS AND ENSURE ADEQUATE
TOCKS ARE AVAILABLE. REQUEST IMPROVED STATUS ON 2 PACING ITEMS.
WO GCU'S (NSN 6110-01-049-8639), ARE REQUIRED FOR F-15'S AT DHAHRAN.
OR A-10'S, LACK OF JO-BOLTS IS CAUSING SERIOUS CONCERN. WE
URGENTLY SHOW BB STATUS ON NSN 5320-00-317-2717, WHILE JO-BOLTS OF
THREE OTHER SIZES ARE IN SHIP STATUS. THE 33 TFW AT TABUK HAS NOT
RECEIVED ANY WRSK REPLENISHMENT TO DATE. INVESTIGATION CONTINUES TO
DETERMINE CAUSE OF DELAY. DESERT BOOTS ARE ON-LINE AND WILL BE
USHED INTO AOR WHEN AVAILABLE.
MUNITIONS: CBU-87'S AND AGM-65'S HAVE ARRIVED AT PORT:
WAITING DOWNLOAD AND DISTRIBUTION TO UNITS.
ENGINEERING AND SERVICES: USCENTAF/DE TOP PRIORITIES ARE:
FORCE BEDDOWN, OPERATION SUPPORT AND TRANSITION FROM TENTAGE TO
TEMPORARY FACILITIES. CURRENT EMPHASIS IS CONCENTRATED ON CONNECTION
O COMMERCIAL UTILITIES, MUNITIONS STORAGE AREAS, AND POL STORAGE
CAPABILITY.
PRIME BEEF: THE MISSING TRANSFORMER COMPONENTS FOR KING
FAHD AP WERE LOCATED AND SHIPPED FROM KKI. SIX HEAVY EQUIPMENT
OPERATORS DEPLOYED FROM BATEEN TO JEDDAH NEW TO ASSIST IN