IMMEDIATE PAGE 4
MLN 2749
0517: ODMA,GTC INOP/FUEL SHUTOFF VLV INOP. PARTS ON ORDER.
21/LRD TR4CKING. ETIC P PLUS 2.
0940: 00MA, #1 MAIN TANK LEAKS, TANK SEALS ON ORDE R, AWAITING
PARTS. ETIC P PLUS 36.
0941: OOTH, OIL QTY TRANSMITTER lNOP, 21/LRC STILL WORKING
PARTS. ETIC P PLUS 2.
0539: OOTH, NAV SYNCHRO INOP, PARTS DUE INTO OEDR 1515/19AUG.
TRYING TO LOCATE PART. ETIC P PLUS ONE.
6582: OOTH, DOPPLER COMP INOP. 21/LRC STILL WORKING. ETIC P PLUS 1.
0498: ODMA. INU INOP. PART INBOUND. ETIC P PLUS 1.
2. MHE STATUS:
RIYADH: ONE 1OK NMC FDR STARTER/BENDIX. PARTS COMING FROM CONUS
FOR TEMPORARY FIX. ONCE INSTALLED WILL MOVE IT TO EDAF FOR
PAGE 06 RHIUAADO162
PERMANENT FIX. //
GENTEXT/COMMUMICATIONS: NONE/
GENTEXT/ PERSONNEL: NONE. /
GENTEXT/COMMANDER'S EVALUATION:
1. GOOD NEWS IS THAT THE R-14 FUEL SYSTEM AT JUBAIL IS
OPERATIONAL. HOWEVER. WE ARE UNABLE TO CONFIRM SYSTEM ADEQUACY
DUE TO POOR COMM. WITH ALCE. R-l 4 FUEL SYSTEM AT DHAHRAN NOT
OPERATIONAL- NEEDS TWO PARTS. CENTAF/LG WORKING TO SECURE BOTH
PARTS.
2. MAJ. METS (21/DOX) ARRIVED. HE WILL BE REFLECTED IN THE
19 AUG SIRREP.
3. DISASTER PREPAREDNESS EQUIPMENT /GEAR:
A.ACCORDING TO CENTAF D.P. [(b)(2)] MAC PERS,
DEPLOYED TO THEATER WITHOUT CORRECT DP SUIT QUANTITIES. IT
SEEMS MAC HAS SUPPLEMENTED AF REQUIlEYENTS AND REDUCED QUANTITY
0= DP GEAR PER SUIT FROM WHAT A= REQUIRES. RESULTS ARE PEOPLE
lN THE THEATER DO NOT HAVE THE DP GEAR IN CORRECT QUANTITIES--
THUS -MITING CENTAF DP PERSONNEL'S CAPABILITY IF WE COME UNDER
CHEMICAL ATTACK AND ARE REQUIRE) TO CONTINUE OPERATIONS.
B. AFTER LOCAL INSPECTION OF DP GEAR, SEVERAL PERSONNEL
IMMEDIATE PAGE 4