Document Page: First | Prev | Next | All | Image | This Release | Search
File: aabgr_04.txt
operation.
1035 Recon Team #2 reported the British have gone to MOPP 4
around C-3/H-3 because of a possible contaminated aircraft.
1036 Recon Team #3 report they have completed test 4 - 7
on the M256 Kit.
1045 Dispatched Team #2 to C-3/H-3 to perform CAM and M256
kit test.
1053 Recon Team #3 reported all M256 Test were Negative at
34L.
1110 Recon Team #2 reported the British had retested the
suspect aircraft and found it was clean.
1115 Recon Team #2 was directed back to their dispersed
location.
1400 P-Tabs taken. Next dose at 2200hrs.
[(b)(l) sec 3.4 (b)(l)]
2200 P-Tab taken.
18 JAN 91
0006 Reported fire on British Tornado near A-3. Fire was
extinguished with portable fire extinguishers.
0150 M8A1 alarm going off in SRC (remote) CERT-1 dispatched
to reset. Set off by fuel fumes.
[(b)(l) sec 3.4 (b)(1)]
[(b)(1) sec 3.4 (b)(l)]
[(b)(l) sec 3.4 (b)(l)]
[(b)(l) sec 3.4 (b)(5)]
[(b)(l) sec 3.4 (b)(l)]
[(b)(l) sec 3 4 (b)(5)]
Document Page: First | Prev | Next | All | Image | This Release | Search