Document Page: First | Prev | Next | All | Image | This Release | Search
File: aabeu_06.txt
P3I UPGRADE. FOUR OF THE LRU-3'S ON OUR TISS STATION AND
HAD THE FOLLOWING PROBLEMS:
{A} THE FIRST LRU-3 REQUIRED AN ADJUSTMENT TO THE 20MHZ
ALIGNMENT.
{B} THE NEXT LRU-3 FAILED IN TEST GROUP SIX. A JUMPER WIRE WAS
BROKEN AND AN ECL ALIGNMENT WAS REQUIRED.
{C} THE THIRD LRU-3 PASSED PERFORMANCE TESTS BUT REQUIRED
REPLACEMENT OF 2A22, 2A62, AND 2A63 CIRCUIT CARD ASSEMBLIES {CCA,S}
TO FIX 20 MHZ PROBLEMS. WE HAD TO CONSUME CRITICAL CCA'S TO FIX
THIS PROBLEM.
D. WITH THESE FAILURES, WE MUST MAKE THE DECISION TO RUN EACH
LRU ON OUR TISS STATION TO CORRECT PROBLEMS IN EACH LRU PRIOR TO
SYSTEM INSTALLATION. IN ADDITION TO STRESSING OUR TISS STATION AND
CONSUMING SHOP REPLACEMENT UNIT {SRU} ALREADY IN SHORT SUPPLY THE
P3I ALR-56C LRU-2'S AND LRU-3'S MUST COMPETE WITH UNSERVICEABLE
ELECTRONIC WARFARE ASSETS.
{6} TO MAINTAIN OUR TISS STATION AVAILABILITY WE NEED HELP IN
OBTAINING THE FOLLOWING CRITICAL ITEMS TO RETURN THIS TEST STATION -
TO FULL OPERATION. WE HAVE SIX MICAPS BUT THESE ARE THE CRITICAL
SSGT PICKERING. CCEA. 116
RICK N. PARSONS. COL. CC. 108
Document Page: First | Prev | Next | All | Image | This Release | Search