Document Page: First | Prev | Next | All | Image | This Release | Search
File: aacak_03.txt
AIM 9 234
30MM HEI 291,100
RR-136 CHAFF 16,834
LUU-1 / LUU-5 4728
LUU-2 7292
AGM-65D 1628
RR-170 CHAFF 558,138
MK84 AIR 1100
MK84 LD 2483
30MM CBT MIX 715,356
RR-141 CHAFF 38,427
RR-119 16,096
2.75 WP RX 6500
* AIRLIFT TO AOR REQUESTED.
**AIRLIFT COMPONENTS, SEALIFT BOMB BODIES.
3. - ENGINEERING AND SERVICES: USCENTAF/DE TOP PRIORITIES ARE:
. .
FORCE BEDDOWN, OPERATION SUPPORT, AND TRANSITION FROM TENTAGE TO
. .
TEMPORARY FACILITIES. CURRENT EMPHASIS IS CONCENTRATED ON OPENING
NEW BEDDOWN SITE AT AL KHARJ. IN ADDITION, EXISTING SITES WITH
PROJECTED AIRCRAFT GAINS WILL REQUIRE PRIORITY CONSTRUCTION.
A.~ FIRE PROTECTION: P-19 CRASH TRUCK NON AVAILABLE AT AL
KHARJ.
B~ PRIME RIBS: FIFTEEN TABLE MIXING MACHINES RECEIVED AT
THUMRAIT. THIRTEEN WILL BE REDISTRIBUTED TO SITES. REQUEST TAC/BS
DE EXPEDITE DELIVERY OF REMAINING 17 MIXERS-TO RIYADH VS THUMRAIT.
C PRIME FARE: RATION STATUS:
MEALS DAYS THEATER
RATION ON-HAND SUSTAINABILITY RESERVES
.
B 4,032,614 63 1,920,000
MRE 1,872,669 59 960,000
Document Page: First | Prev | Next | All | Image | This Release | Search