                      (5) 7th Engineer Bpi-gade has only received 10 OPS and 4
            LORAN Systems to date. M-Qneuver units are receiving !St
            priority, Aih,'@le engineer units suppop@@'@ng these are gettin@a none.
            We need these systems to keep up with supporting units.

                      (6) Class III (P) oil is available at '100 BASE
            Echo, bit only in small quantities,. Bde needs Several hundred
            gallons of '5w-40 and at least 1500 gallons of 10@v '@n order to
            commence operations.

                      (7) One battalion app4@lied fpo@r, COYUS with 0 out of 9'@
            authorized KY-57 (Tv7inson-i secure devices. The brigade has been
            allotted '@15 V4.noon from expected deliveries to Corps, but nee s
            at least 75 to meet minimum secure voice                           Request
            50 additional XY-57s.


                      ts) @
                             OMe balttal 4 01-IS are C.
                                                        at 'i-ic-ffec!tive dua to lack
            al ammunition: Igth En Bn      (a'utached to   I AD) and 527th En Dn.
            -No ammunition or engineer     -@niini-t4@ons ape available at LOCI
            BASE E.   '@eqilest i-@iii,@iedi-ate assi @,aLrice.

                      (9) Request assistance in solving problems involving
            receipt o@ LESS. Some 7th Engineer Brigade units have yet to
            receive their December and January 'LESS- Brigade has previously
            submitted list of all assigned units, but has thus lay- received
            only LESS for organic Brigade in'--to from FRO.

                      (10) We have to get definite answers on package mail
            ilo@v after C-,-Day.   It will be almost impossible for brigade to
            receive and transport package mail to units after- O-Day.
            Although Corps OPLAN stated package mail Aiould cease, sources
            indicated packages may continue to flow 'lo 'z,WA.

                      ,@ll) Two sets o@ M-19 natting are available at Dammam
            PC)I't. Need high prior4lty to have matting transported forward.
            MattinF- is required to construct a forward Cl@@O Airstrip.

                      (12)   @12a can only partly ily comply with            fratricide
            guidance to place V      I'@ panel markets on. vehicles due to
            shortages-    Brigade has ordered through C,@-4, and still rieada over
            2000 Parker.      Time 4.--

            2. PO@@ S-3, 7th Engineer





                                                 R A g E,@

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 35 f:/Week-24/BX000213/SITUATION REPORTS 7TH ENG BDE 22 DEC 90- 10 APR 91/daily commander sitrep:07269614225918
Control Fields 17
File Room = jun96_declassified
File Cabinet = Week-24
Box ID = BX000213
Unit = VII CORPS
Parent Organization = ARCENT
Folder Title = SITUATION REPORTS 7TH ENG BDE 22 DEC 90- 10 APR 91
Folder Seq # = 1
Subject = DAILY COMMANDER SITREP
Document Seq # = 18
Document Date =
Scan Date = 25-JUN-1996
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 26-JUL-1996