                                                                 OPERATION DESERT SHIELD
                                                                 271100 Jan 91




               FRAGO 4 1-91-24 to 7th Engineer Brigade OPORD 1-91

               1,   '3  u, Etc, i o , INo change.


               2.   Mission: No Change.

               3.   Execution:

                    a. Concept of Operation: 926 EN GP tran8ferz req-aireraenz
               for  construction of 6-dual lane crossing zi-tes to 176 EN GP

                    b. Subunit ta@k8:

                         (1)   176t@ EN GP;

                              (ai Construct dual lane crossings over Tapli-ne.

                              ('n) Report this as riiis8ion 7@0-'76.

                         (21, 996 EN GP xl-lieved from resoon8ibiliity for 6 sites.

                    c. Coordinating Instructions:

                         (1@   FOC is CPT Mar-khani,    3AD, 9-409-2303.

                         (2)   Kepop'@ status using

                         (31,  Reqiaii,@-ex at--Lp'c daL@ e28 Jan gi.

                               P,                       d.@tC-!  1 Feb @I.

                    d. S@or,,c-,of (Plork! Construct      six dual lane crossings ivithin
               the folio@,jing sectop@

                                   N 28 45' E 45 O@@1.2'       to N 28 43@3' E 4s-!. 06.2'

                    e.   EnginaeT, Peco)an@-issaiiae aliot@is  the foll@@uirig!

                         (if N 28 45.07' E 45 01.09 -          four locations -@vhere pipe
               is already covered. CrosE:I.ng'abil@@@.y        over Tapline road is good.

                         (2) N 28 42-04 E 45 09.07 - Long area where pipe is
               covered.     k%riay -be able to fit 4 - 6 crossings here.        Mist turn
ssing over pipe for easiest crossing over
               T&Dliiie road. Approaches to @a@plirie road may ,qeed
               gradir,g/levelling.

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 143 f:/Week-24/BX000213/7TH ENG BDE FRAGOS 001-91 THROUGH 1-91-72/frago 1 91 31 7th eng bde opord 1 91 tth eng bde:08099611155646
Control Fields 17
File Room = jun96_declassified
File Cabinet = Week-24
Box ID = BX000213
Unit = VII CORPS
Parent Organization = ARCENT
Folder Title = 7TH ENG BDE FRAGOS 001-91 THROUGH 1-91-72
Folder Seq # = 13
Subject = FRAGO 1 91 31 7TH ENG BDE OPORD 1 91 TTH ENG BDE
Document Seq # = 46
Document Date =
Scan Date = 25-JUN-1996
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 09-AUG-1996