Document Page: First | Prev | Next | All | Image | This Release | Search

File: 102996_jun96_decls2_0014.txt
Page: 0014
Total Pages: 87

Subject: DAILY COMMANDER SITREP                                          

Unit: VII CORPS   

Parent Organization: ARCENT      

Box ID: BX000213

Folder Title: SITUATION REPORTS  7TH ENG BDE  22 DEC 90- 10 APR 91                                            

Document Number:          3

Folder SEQ  #:          1










         Daily SITREP 7th Engineer Brigade

         24180f@iC MAR 91


         TO, VTI Corps G-3 (OPS)

         1.   Dai 1,@ Commander SITREP,

              a . Situation,    Engineers @e now focusing on MSR maintenance
         and  destruction of li-a-,i equipment and supplies. We are planninq
         +or  movement back to RO@AS. 7th Engineer Brigade has operated
         Equipment in theater on an extensive basis since the first
         in December 199@-7s.  There has been no let-Ltp, operations continue.
         Have directed spec:4-+ic maintenance actions ir-, preparation +or
         redeployment.    E,,,,pL-ct OR rate to initially fall significantly.
         It will improve C-.VLF- time.   Brigade is currently maintaining over
         l@617JO tons of l@iSRs -'in Corps sector. Assumption of XVTII Airborne
         Corps sector will stress assets t2@@ +eel vie can accomplish
         -ni Ss i or-,.-
         I          @o,,nh:-it engineer battalions continue demolition ffissi-cn,
         combat heavy maintain N.SR5.     Divisions should utilize organic
         engineer assets for          in their sector.    We are concerted about
         lack of Corps level logistical support -Forward of Log Base
         Ne2lingen. MovemL-rtt into the XVIL'I Airborne Corps sector
         necessitates the need for- Corps 'level logistical support (Class
         1, III and IX) forward in. the Corps sector.

              e. Conba-@ Support Equipment Readiness           Ss
         Lack of Class IX repair parts is adversely affecting -the OR rate.
         The MI,3 fleet is at 797. The -Fleet OR will decrease as the
         mechanized en-ineers are heavily iivolved in Task Force Demo.
         Running gear, track,., road L@hc-L-is and shock absorbers are a
         special problem. Coordination with COSCOM '@ASCMAT 2CJ Mar 911)
         shows no availability throughout the sL,,ppli, system.

              +. Personnel


                    It Pers i n             % i 1-i               PLrs
        Theater-                Theater             in FAAs
                       555@-J                                     5@@@7Jf-@s


         (NOTE. Does not include approximately        14:7,5 soldiers in theater
         attached to other MSCS.)


                  Unit Loc@itions:


                  HHC 7 ENG BDE         PU 75@) )(@57
                  HHC 176th ENG GP      NS 4f;@5925
                  HFIC 926th ENG   GP   NS 520590


              h.  Problems Requiring    Corps Assistance,.

                  1. Cutting Edges. Present effort by 7th Erigr Bde to
         procure  clittiig edges for road graders and dozers involves a
         lengthy  process and produces limited results. Current supply a-F
         cutting  edges is low. I will continue to attempt to procure
         these items, but may be forced to curtail MSR maintenance in the

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 87 f:/Week-24/BX000213/SITUATION REPORTS 7TH ENG BDE 22 DEC 90- 10 APR 91/daily commander sitrep:10259613090426
Control Fields 17
File Room = jun96_declassified
File Cabinet = Week-24
Box ID = BX000213
Unit = VII CORPS
Parent Organization = ARCENT
Folder Title = SITUATION REPORTS 7TH ENG BDE 22 DEC 90- 10 APR 91
Folder Seq # = 1
Subject = DAILY COMMANDER SITREP
Document Seq # = 3
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 25-OCT-1996