04/18/91
JULLS LONG REPORT
1. (U) JULLS NUMBER: 40157-39313 (00314)s submitted by RLY
AFZN-PTM-MB, Mrs King, 856-3674, (913)239-3674.
2. (U) Operation DESERT SHIELD conducted by USCENTCOM on 02/08/91.
3. (U) KEYWORDS: EXEC SUM.
4. (U) TITLE: SUMMARY - Phase I - Mob Plans/DPTM
5. (U) EXECUTIVE SUMMARY FOR MOB PLANS:
S. The benefit of monthly Mobilization Planning Cell
meetings was immediately apparent as Fort Riley began to receive
mobilized units and deploy units under Operation Desert Shield.
Mobilization Plans Office reqested two IMA officers; both were
experienced and familiar with Fort Riley mobilization plans and
procedures through participation in the JCS MOBEX and annual
training tours. Their arrival at M+ 23 enhanced the support we
were able to provide to Mob Cell and the units.
b. Fort Riley's participation in the JCS MOBEX and monthly
MOB meetings had produced a trained nucleus in each
directorate. Fort Riley executed the reception and inprocessing
of Reserve Component Unit Advance Parties essentially as
practiced in exercises except DOL opted to remain in its normal
work areas and have the Advance Parties come to them. This
prevented a final check by DPTM Mob to ensure all coordination
was accomplished. Nevertheless, only in a few isolated
instances did this diversion from the plan impede the units'
smooth reception, training, and deployment.
C. Readiness Group Fort Riley CRGFR) dispatched an officer
to the units' home stations as soon as the units were alerted.
eatly assisted both the units and Fort Riley by ensuring
that preliminary planning -Focused on the most urgent and time
sensitive issues.
d. Each unit's advance party arrived at the Mob Station at
least two days prior to the unit main body. All but the DOL
inprocessing was accomplished in Bldg 222, Mob Operations
Center. AS scrubbed the unit current manning, updated the data
base, and accomplished the necessary actions to raise the
unit's C ratings as needed. MEDDAC collected unit medical
records and reviewed class XIII requirements. Readiness Group
Fort Riley prepared a training schedule with required training
and key events identified. Activities responsible for
presenting or assisting with training (SJA, NBC, MEDDAC,
SeCLLrity) interfaced with the units' advance parties and helped
produce an initial training plan. The DPTM Security Division
reviewed clearance requests and also ensured STU Ills were
subhand receipted to the units during their stay at Fort Riley.
The Provost Marshal's Physical Security Office coordinated arms
UNCLASSIFIED
II-4
Document Page: First | Prev | Next | All | Image | This Release | Search
Document 517 f:/Week-26/BX001008/DESERT STORM AFTER ACTION REPORTS/special information for installation after actio:12179611150511
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-26
Box ID = BX001008
Unit = 1ST ID
Parent Organization = VII CORPS
Folder Title = DESERT STORM AFTER ACTION REPORTS
Folder Seq # = 11
Subject = SPECIAL INFORMATION FOR INSTALLATION AFTER ACTIO
Document Seq # = 4
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 17-DEC-1996