Subject: SPECIAL INFORMATION FOR INSTALLATION AFTER ACTION REPORT        

Unit: 1ST ID      

Parent Organization: VII  CORPS  

Box  ID: BX001008

Folder Title: DESERT STORM AFTER ACTION REPORTS                                                               

Document Number:          4

Folder Seq  #:         11











                                  OPERATION DESERT SHIELD/STORM
                                           NBC EQUIPMENT




          FLOW OF IST ID (M) REPLACEMENTS FOR NBC EQUIPMENT (DEC 90):

          FITTING                DRAW AT                      MASK CONFIDENCE
          NBC SCHOOL     --- >   CIF               --- >      EXERCISE (3 HRS)
          (BLDG 211)             (BLDGS 376/360)              (CS CHAMBER)

          MASK                   MASK                         INSTALL FILTERS
          SUIT                   FILTERS (2 SETS)             INSPECT MASK
          BOOTS                  CARRIER                      COMPONENTS
          GLOVES                 CANTEEN CAP*                 TRANSPORT TO
                                 INLET CAPS (2)               CHAMBER
                                 EYELENS' OUTSERTS (2)
                                 E(EADHARNESS                 EXERCISE
                                 VALVE DISKS (4)
                                 HOOD*

            ITEMS DID NOT COME   IN A%DEPOT PACK MASK; CIF    HAD TO STOCK.

          REMARKS: CIF HAD TO    BE FLEXIBLE WITH ISSUE OF    MASKS. INDIVIDUALS
          WERE ALLOWED TO SIGN   FOR MASK ON A DA 3161 AND    TO DX UNSERVICEABLES.
          POST CHEMICAL INSPECTED UNSERVICEABLES BEFORE TURN-IN.


          RESPONSIBILITIES BY ACTIVITY:

          POST CHEMICAL (NBC SCHOOL) -

            o OBTAIN TWO SIZING SETS OF M17 SERIES MASKS (XS, S, M, L).
            o OBTAIN ONE SIZING SET OF M25 SERIES MASKS (S, M, L).
            0 OBTAIN TWO BDO SIZING SETS TO INCLUDE GLOVES (XS, S, M, L).
            o SIZE REQUIREMENTS ON A GROUP BASIS EACH WORK DAY AS REQUIRED.

          DOL (CIF) -

            o TRANSFER ROTC MASK STOCKS FROM RCB TO CIF.
            0 ISSUE/REQUISITION MASK ACCESSORIES AS ABOVE.

          1ST REPLACEMENT COMPANY -

            * SCHEDULE FITTING WITH POST CHEMICAL.
            * SCHEDULE DRAW WITH CIF.
            * SCHEDULE CS CHAMBER EXERCISE WITH POST CHEMICAL AND BUS
       TRANSPORTATION WITH TMP.











                                             III-32

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 517 f:/Week-26/BX001008/DESERT STORM AFTER ACTION REPORTS/special information for installation after actio:12179611150511
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-26
Box ID = BX001008
Unit = 1ST ID
Parent Organization = VII CORPS
Folder Title = DESERT STORM AFTER ACTION REPORTS
Folder Seq # = 11
Subject = SPECIAL INFORMATION FOR INSTALLATION AFTER ACTIO
Document Seq # = 4
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 17-DEC-1996