Document Page: First | Prev | Next | All | Image | This Release | Search
File: 123096_jun96_decls9_0013.txt
Subject: DEPLOYABILITY CRITERIA AND LEAVE TERMIN FOR CONTIN OPER
Unit: 101ST ID
Parent Organization: XVIII CORPS
Box ID: BX001604
Folder Title: DEPLOYMENT DOCUMENTS
Document Number: 2
Folder Seq #: 396
UNCLASSIFIED
ANNEX B - PERSONNEL
A. POR PACKETS - POR packets will be collected at the and of the POR
by the 101st roc. 101st PSC will control an POR packet* throughout
the deployment. POR packets will accompany the 101st PSC upon full
division deployment.
B. Battle Rosters/TACCS - Brigade Headquarters element will initially
deploy with TACCB computer syst4m., fully loaded with Battle Rosters
and C28RS* Battalion TACCO will deploy in subsequent loads.
C. Casualty Feeder Reports and Witness Statements (DA Forms IISS and
1156) - Unit commanders must ensure that each soldier carries a DA
Form IISS and IIS6 in the individual first aid pouch, Unit PACs and
separate company headquarters are to deploy with additional stookage.
D. Forwarding Personal mail - unit commanders must ensure that each
individual Completes PS Form 39SS Change of Address and Directory
Card* (Additional supplies may be obtained by calling DOIX Postal
section# Kre Conner# ext. 281s). Dependents of soldiers are
authorized to pick up mail unless the soldier provides written
exception to the unit mail clerk.
Ze Mail Orderlies - Each unit headquarters must deploy with a
qualified mail orderly to receive mail.
7, POR Schedule - POR for initial deploying units will be conducted
at Franotallo Gym IAW the following schedule:
TIME URIT
110700 AUG AVN HQs/4/101 MP PLT
110800 AUG 1-101 ATKO 4/HHB/2-44 ADA* PPDR
DET I (-)* LRSD (-)
111000 AUG 2ND BDE HQ* B/311 XI,, B/2-44 ADA
B/326 EN (-)j, B/2/501 BIG
111100 AUG 3-502 IN
111400 AUG Tr 9-101 AVK
111700 AUG I-SO2 IN
111900 AUG 63 CHEM* 2ND BDE PASCO
G. XWR - Units should deploy with appropriate i= equipment such as:
volleyball* playing cards, games# etc* The equipment should be enough
to suitable support their own unit.
No PDS Reporting - A PDS will be submitted 1000 hre daily with
strength information reflecting as of 0600 hro. The PDS should
reflect the one on page X-1-A-1-1 and X-1-A-1-2 located in the lolst
airborne Division (Air Assault) TAC SOP. The task organization used
will be the one that is in effect at 0600 hro of that day*
B-1
UNCLASSIFIED
Document Page: First | Prev | Next | All | Image | This Release | Search
Document 22 f:/Week-22/BX001604/DEPLOYMENT DOCUMENTS/deployability criteria and leave termin for cont:12179611151622
Control Fields 17
File Room = jun96_declassified
File Cabinet = Week-22
Box ID = BX001604
Unit = 101ST ID
Parent Organization = XVIII CORPS
Folder Title = DEPLOYMENT DOCUMENTS
Folder Seq # = 396
Subject = DEPLOYABILITY CRITERIA AND LEAVE TERMIN FOR CONT
Document Seq # = 2
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 17-DEC-1996