III. SPECIFIC OPERATIONAL ACTIVITIES
A. ARCENR ENGINEER
1. FUIWM/M:)BILE CP: No entry
2. OPERATIONS: See DA 1594
3. FACE=ES/ODNSTRUCrION:
A) Theater EPW Camps: Both BFDM and BROOKLYN are 98% complete
and can handle 48,000 EPWs each. Remining work to improve waste water
collection on both sites does riot affect overall capacity.
B) Corps EPW Camps: Operating
C) Pipeline:
1) Phases I through III are complete
2) Phase IV: no demand fran LOGBASES; will shut down to lay
15 imiles of rigid pipe; BCD is 5 Mar.
3) Phase V is 193KM to IDGBASE ALPHA. 178KM installed, line
is operable to PS#7 (96M mark); 475th is preparing a temporary station.
Further effort is on hold at this time.
D) Patriot Power: DHAHRAN battery is hocked up to camercial
power. UgaPM AB Battery ContXaCtor left the Country. 535th EN DEr and
SUPOOM engineer working; no ECD. Transformer being installed at I
Document Page:
First |
Prev |
Next |
All |
Image |
This Release |
Search
Document 99 f:/Week-33/BX000525/COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL/operational summary 24 feb 91 g day:04189716374911
Control Fields 17
File Room = aug96_declassified
File Cabinet = Week-33
Box ID = BX000525
Unit = ARCENT
Parent Organization = CENTCOM
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Folder Seq # = 9
Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Doc Seq # = 5
Doc Date =
Scan Date =
Queued for Declassification = 25-AUG-1996
SAGWI Request = 10-APR-1997
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 18-APR-1997