Subject = OPERATIONAL SUMMARY   24 FEB 91 G DAY                           

Parent Organization = CENTCOM     

Unit = ARCENT      

Folder Title = COMMAND REPORT  AFTER ACTION REPORT ENGINEER GE CELL                                            

Document Number =          5

Box ID = BX000525








             III. SPECIFIC OPERATIONAL ACTIVITIES


                 A.  ARCENR ENGINEER


                     1. FUIWM/M:)BILE CP: No entry

                     2. OPERATIONS: See DA 1594


                     3. FACE=ES/ODNSTRUCrION:

                         A) Theater EPW Camps: Both BFDM and BROOKLYN are 98% complete
             and can handle 48,000 EPWs each. Remining work to improve waste water
             collection on both sites does riot affect overall capacity.

                         B) Corps EPW Camps: Operating

                         C) Pipeline:

                           1) Phases I through III are complete
                           2) Phase IV: no demand fran LOGBASES; will shut down to lay
             15 imiles of rigid pipe; BCD is 5 Mar.
                           3) Phase V is 193KM to IDGBASE ALPHA. 178KM installed, line
             is operable to PS#7 (96M mark); 475th is preparing a temporary station.
             Further effort is on hold at this time.

                         D) Patriot Power: DHAHRAN battery is hocked up to camercial
             power. UgaPM AB Battery ContXaCtor left the Country. 535th EN DEr and
             SUPOOM engineer working; no ECD. Transformer being installed at I

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 99 f:/Week-33/BX000525/COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL/operational summary 24 feb 91 g day:04189716374911
Control Fields 17
File Room = aug96_declassified
File Cabinet = Week-33
Box ID = BX000525
Unit = ARCENT
Parent Organization = CENTCOM
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Folder Seq # = 9
Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Doc Seq # = 5
Doc Date =
Scan Date =
Queued for Declassification = 25-AUG-1996
SAGWI Request = 10-APR-1997
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 18-APR-1997