Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Parent Organization = CENTCOM
Unit = ARCENT
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Document Number = 5
Box ID = BX000525
K) MSR Status:
West Range Road - Azaber, 43 EN BN I s is rxyw EM 15 Mar
East Range Road - Red, has been defexred.
SE Dodge - Green, shoulder work revised E)M is 24 Feb due to
rain delay/daipage.
NW Dodge - Green, cold patch work casing mirlual traffic
disruption.
Sultan(Nash) - Green
NW Old Tapline - Green
SE old Taplirie - Green
XVIII ABN Corps MSRs to LOGBASES ROMEO and OSCAR
Georgia - Green - 6 lanes; due to rain
Montana - Green - 6 lanes good to border
T@-@ - Green - 2 lanes; due to rain
Chic - Green - 2 lanes good along border
Virginia - Green - 2 lanes gravel
Colorado - Green - 2 lanes gravel
VII gg= KEY MSRs
Green and Blue - Green - 2 lanes
Black - Green - 2 lanes gravel
B. EAC/416TH ENOCt4: Engineer Status Report #64 05093OZ MAR 91 and
Ccmkirider's SRIP@EP #78 05093OZ MAR 91.
A) CURRENR OPERATIONS: Range Road is Amber. 43D EN BN continues
to repair a sub-base failure; EM is 15 MAR to initial standards. All of
MSR Dodge is Green. MSR Sultan is Green. All other roads still green.
SKAPDOP - Pipeline project: Phase V 85% 179Kt4 of rigid pipe has been
installed. Quartermaster has ceased hauling pipe to complete this
segment, the line has been successfully tested to PLMP Station #7. No
further testing will be completed. per quartermaster. EPW OOMPOUNDS:
Eastern Site: Camp #lA 90% Continuing installation of force rain and
check valves. Facility will be reported complete once all engineer tasks
are complete including lighting and sanitary facilities. western site:
#2 85% Engineer effort on site is complete. There are 22 towers, 320
latrines, and 135 showers on site. Digging sumps and improving roads
continues. The sanitary lagoon is complete. Additional requirements for
EPW processing are underway. 02A 80% 100% of caup is bermed. The
sanitary lagoon is complete. Additional requirements for EPW processing
are underway.
B) ENGINEER ISSUES: N/A
C) PRIOR= OF Wol@K: Priority is to pipelines, then MSRS.
D) PRIORITY OF SUPPORT: N/A
E) TOPOMIAPHIC SUPPORT: NIA
F) PROPOSED OPERATIONS: A quantitative MSR Report will be
submitted weekly beginning 10 MR, by separate correspondence.
G+8 PG 4
Document Page: First | Prev | Next | All | Image | This Release | Search
Document 99 f:/Week-33/BX000525/COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL/operational summary 24 feb 91 g day:04189716374911
Control Fields 17
File Room = aug96_declassified
File Cabinet = Week-33
Box ID = BX000525
Unit = ARCENT
Parent Organization = CENTCOM
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Folder Seq # = 9
Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Doc Seq # = 5
Doc Date =
Scan Date =
Queued for Declassification = 25-AUG-1996
SAGWI Request = 10-APR-1997
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 18-APR-1997