Subject = OPERATIONAL SUMMARY   24 FEB 91 G DAY                           

Parent Organization = CENTCOM     

Unit = ARCENT      

Folder Title = COMMAND REPORT  AFTER ACTION REPORT ENGINEER GE CELL                                            

Document Number =          5

Box ID = BX000525





                                         UNCLASSIFIED
                                              05]MAR gl/G+9

              I. OPERATIONAL SLII-IAM

                  A. FPAGOS ISSUED: FRAM 073 DTG 05060OZ, SUBJ: Relief frcni Mission to
              clear IPSA Pipeluv-- Road as MSR and FRAGO 075 DIG 05010OZ, SLBJ: Iraqi and
              Coalition Forces Coordination Point


                  B. TASK ORAANTZATION: No change, See Annex A

                  C. UNIT ATUUVAJLS: None
                                                                                              00
              II. LOGISTICAL SUMMARY: IDG= INPUR (Paragraphs 4 and 9)
              4(U@* CLASS IV: IARR.E QM=ES OF CL IV ARE RCan'E TO OR BEIM
              IOCATM IN THEATER. CNCE SPECIFIC 9-Ml?=ES ARE IDENTIFIED AND FURURE,            w
              OPERATICNAL PRa7ECr RECMDOMMCNS ARE PREPARED, TOTAL DISPOSITION PIANS           i
              CAN BE DEVELIOPED. POC CPT MARSZALEK 7804-449.


                  A. AIRFIELD HATIM4G: AS PART OF OVERALL CLEANUP, LWM ARE PJXMED
              nM AIRFIELD KkTrING MJSR BE RECOVERED. THE VASR NATORTW OF THE KMTC
              ISSUED VMS M19 WHICH HAS A RECOVERY CODE OF "D'i (REPAMABLE). PER 22D           w
              SUPOOK MSG 25120OZ FEB, SLJW: DISPOSAL OF MATERIAL AND BQUIPMERR,
              REPAIRABLE CL VII MUST BE TURNED IM THE 165TH Ht4SC AT ICW. POC LTC
              MURPHY 7804-449.


                  B. DUST PAILMM/CRUDE OIL: BOFIH CORPS INDICATING A CRITICAL NEED
              FOR CRUDE OIL. DELIVERIES FRC[4 RIYADH TO XVT.II OC)RPS CONTINUE. VII CORPS
              %MW BE ABLE TO DRAW ERCt4 THE ARkl@M PNDELM AT AL-QAYSUMAH CNCE
              REPAIRS TO THE TRANSFER PLZT ARE OU4PI=, EM 06 MAR. POC LTC MURPHY
              7804-449.


                       ENGINEER DATA:
              9(UY,4
                  A.   PCIU CONSTRUCrION/REHAB: No CHANGE.

                  B.   AIRFIELD IVOIffENANCE AND REPAIR: No CHANGE.


                  C.   THEATER MAIN SUPPLY F@OM MAINTENANCE AND REPAIR: MSR SIMEBAI

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 99 f:/Week-33/BX000525/COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL/operational summary 24 feb 91 g day:04189716374911
Control Fields 17
File Room = aug96_declassified
File Cabinet = Week-33
Box ID = BX000525
Unit = ARCENT
Parent Organization = CENTCOM
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Folder Seq # = 9
Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Doc Seq # = 5
Doc Date =
Scan Date =
Queued for Declassification = 25-AUG-1996
SAGWI Request = 10-APR-1997
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 18-APR-1997