Subject = OPERATIONAL SUMMARY   24 FEB 91 G DAY                           

Parent Organization = CENTCOM     

Unit = ARCENT      

Folder Title = COMMAND REPORT  AFTER ACTION REPORT ENGINEER GE CELL                                            

Document Number =          5

Box ID = BX000525








             of rigid pipe has been installed. Quartermaster has directed that no
             additional pipe be transported to complete this segment. The line has
             been successfully tested to pump Station #7. The quartermaster will
             operate a teqocrary fuel dispensing station at Pump Station #7. EPW
             CCMPOUIDS: Eastern Site: Caffp #IA 90% The facility is complete. Western
             site: #2 Bst Engineer effort on site is omplete. niere are 22 towers,
             320 latrines, and 135 showers on site. Digging sumps and improving roads
             oontimes. Ihe sanitary lagoon is complete. Additional requirements for
             EPW processing are underway. #2A 80% 100% of camp is bermed. The
             sanitary lagoon is complete. Additional requirements for EPW processing
             are underway.

                     B)  ENGRIEM ISSM: N/A

                     C)  PRioRrry OF wow: Priority is to pipelines, then MsRs.

                     D)  PRIORITY OF SUPPOIC: N/A

                     E)  TOPOGRAPHIC SUPPOEE: N/A

                     F)  PROPOSED OPERATIONS: A quantitative MSR Report will be
             sutmtted weekly begimim 10 MR, by separate correspondence-

                 C. CORPS

                     1. VII COP.PS/7TH ENM BDE: Report not received

                     2. XVIII AEN ODRPS/20RI EWR BDE: Report not received































                                              C49 PG 5

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 99 f:/Week-33/BX000525/COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL/operational summary 24 feb 91 g day:04189716374911
Control Fields 17
File Room = aug96_declassified
File Cabinet = Week-33
Box ID = BX000525
Unit = ARCENT
Parent Organization = CENTCOM
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Folder Seq # = 9
Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Doc Seq # = 5
Doc Date =
Scan Date =
Queued for Declassification = 25-AUG-1996
SAGWI Request = 10-APR-1997
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 18-APR-1997