Document Page: First | Prev | Next | All | Image | This Release | Search

File: 980226_aug96_sagwi2_0024.txt
Page: 0024
Total Pages: 132

Box ID = BX000524

Folder Title = HISTORIANS BACKGROUND MATERIAL FILES  CALL COMBAT COLLECTION PLAN                               

Unit = ARCENT      

Parent Org = CENTCOM     








                --------------------------------------------------------------------------------------------------------------------------------
                ISSUE                     SUB-TISK                             LEVEL($)               FREQUEICT                    LOCAT Tol
                (Log-Center  ---------------  o-Should-ve-design-generators    --- Theater/Corps/Div/ --- Sustaincent ---------------  TACON/COSCOX/DISCOMI.BSA
                can't)                        to be as survivable as the       Rde
                                              equipment to which they
                                              provide power?

                                              aAssess the adequacy of chemi-
                                              cal protective equipment.
                                              What was the average combat
                                              effective time for soldiers
                                              full KOPP gear in desert en-
                                              vironment? Assess the avail-
                                              ability of replacement protec-
                                              tive equipment. Assess the
                                              adequacy of chemical detection
                                              devices.

                                              aAssess the capability of
                                              soldier's individual protec-
                                              tive equipment.

                                              aDoes the onvioment have an
                                              effect on the machine shop
                                              sets equipment?

                                              aHow well does the compressor
                                              on the welding shop trailer
                                              mounted function in the desert
                                              environments

                                              aWere A?Ps employed and were
                                              'hei successf,,',? What was
                                              the ano support structure
                                              and how did this work with or
                                              without INS?

                                              aWere sufficient amo,.nls of
                                              Class 11 a loan!? Right type,
                                              right packaging, et,? Were
                                              t@e@e s,.!Iicient amounts of
                                              ano available? How soon were
                                              controlled supply Fares
                                              established?

                                              aAdequacy of on hand 1 val can-
                                              .race assets used or infor-
                                              mal pipe7@ire.

                                              aWas host nation support ava4@-
                                              able? How was it used?








                                                                                   ?-23

Document Page: First | Prev | Next | All | Image | This Release | Search