Document Page: First | Prev | Next | All | Image | This Release | Search

File: 980404_jul96_sagwi1_0034.txt
Page: 0034
Total Pages: 39

Subject = CHANGE 3 TO XVIII ABN CORPS FIELD SOP  7 JAN 91                 

Box ID = BX000436

Folder Title = DAILY JOURNAL ARCENT 27 JAN 91                                                                  

Unit = ARCENT      

Parent Org = CENTCOM     



                         0
                                                                   8-

           ENCLOSURE 1 (LOGISTICS STATUS REPORT FORMAT) TO TAB A (LOGISTICAL
           STATUS REPORT) TO APPENDIX 4 TO ANNEX X (REPORTS) TO XVIII AIRBORNE
           CORPS FIELD SOP

           Col 5. Numbers supported last 24-hours.

           3. Graves registration.

           Line A. Reporting GRREG activity.

           Col 1.  6-digit location.
           Col 2.  Number remains received.
           Col 3.  Number remains to be evacuated.
           Col 4.  Number remains on-hand.
           Col 5.  Number transfer cases on-hand.
           Col 6.  Number unused remains pouches on-hand.
           Col 7.  Number personal effects bags on-hand.

           Line B. Narrative. (Comment on critical supply and equipment
           shortfalls, include requisition numbers as required for follow-up.
           Comment on critical shortages of DD Form 567, record of recovery,
           DD Form 565, Statement of recognition, and DD Form 1076, inventory
           of personal effects).

           Part Three - Transportation.

           1. Ground. Division MCO's and Corps MCC comment on status of
           MSRS, railheads, and ports. Comment on significant shortfalls in
           transportation. Expldin schedule for upcoming convoys. Be
        -,:,.specific and quantitative. List numbers by types of Host Nation
           truck assets available.

           2. Aerial Delivery. Include in initial LOGSTAT current DSU/GSU on
           hand balances of aerial delivery items (i.e. quantity/size or
           capacity of slings, nets, POL drums, and water blivets). Report
           changes as they occur.

           3. Pipeline. Include pipeline equipment employed or available by
           type and location.

           4. Air. Comment on requirements for scheduled air (Army or USAF).

           Part Four - BSA/RSA/DISCOM/COSCOM Commanders' Narrative.

           (Report any major concern, shortage, recommended priority change,
           or other recommendation. Is throughput system working? Planned
           BSA/RSA displacements?)






                                         X-4-A-1-5

Document Page: First | Prev | Next | All | Image | This Release | Search