Document Page: First | Prev | Next | All | Image | This Release | Search

File: 961031_950901_8719513.txt
Page: 8719513
Total Pages: 36

SALMAN PAK CBW RSCH PROD A STOR FAC

Filename:8719513
SUBJECT:  SALMAN PAK CBW RSCH PROD A STOR FAC
PATHFINDER RECORD NUMBER: 19513
GENDATE:         950718
NNNN
TEXT:            
ENVELOPE RATMCIAB YEKDQA 5859 3551935-MIDO--YEKDQX
.
ZNY MMIDO ZNZ1
ZKZK RR AAZ DE
HEADER R 211935Z DEC 90 ZYS



[   (b)(1) sec 1.3(a)(4)   ]



/SALMAN PAK CBW RSCH PROD A STOR FAC/[   (b)(1) sec 1.3(a)(4)   ]


STATACT/OPR//
RMK/AD HOC REQUIREMENT -- [   (b)(1) sec 1.3(a)(4)   ] ACTIVITY 
THAT MAY THREATEN DEPLOYED
/FORCES. 
/ON 19 DECEMBER, ADDITIONAL TRENCHES WERE BEING DUG IN THE
/ENGINEERING-RESEARCH AREA. THE TRENCHES ARE [   (b)(1) sec 
1.3(a)(4)   ] TO
/SERVE AS PERSONNEL SHELTERS, AS STEPS HAVE BEEN CUT INTO THE 
EARTH
/AT THE ENDS OF EACH TRENCH. IN ONE X-SHAPED TRENCH A POSSIBLE
/TRAILER OR SHELTER HAD BEEN PLACED INTO A WIDENED PART OF THE
/TRENCH. BETWEEN 1 AND 17 DECEMBER, EARTH WAS PLACED ON TOP OF
/ONE OF THE T-SHAPED RESEARCH-LABORATORY BUILDINGS, POSSIBLY AS
/CAMOUFLAGE, OR AS A POSITION FOR AN ANTIAIRCRAFT ARTILLERY GUN. A
/LARGER THAN USUAL NUMBER OF SEDANS AND SIX BUSES WERE PRESENT IN
/THE ENGINEERING-RESEARCH AREA ON 19 DECEMBER, SUGGESTING A HIGHER
/LEVEL OF ACITVITY. 
/
/CONSTRUCTION HAS NOT PROGRESSED AND MATERIAL WAS STILL IN THE 
OPEN
/AT THE SOUTH END OF THE PROBABLE PRODUCTION SECTION OF THE
/ENGINEERING-RESEARCH AREA. BRUSH HAS BEEN CLEARED AT THE SOUTH
/END OF THE SECTION.
/
/AT LEAST 39 TENTS WERE IN THE SOUTHERN PART OF THE PENINSULA,
/WHICH SUGGESTS A LARGE SECURITY FORCE HAS BEEN ADDED SINCE AT
/LEAST 26 OCTOBER. 
/
/ANALYST [   (b)(6)   ][   (b)(2)   ]
//
[   (b)(1) sec 1.3(a)(4)   ]

[   (b)(2)   ]
 



 

 



Document Page: First | Prev | Next | All | Image | This Release | Search