Document Page: First | Prev | Next | All | Image | This Release | Search

File: 082696_doc1_564.txt
Page: 564
Total Pages: 652


 float of ~UOU FF'M per T&LU  Two options I or deployin~ T&~U are:

        Air transit, with two C 141 air car~o plane -  The Mobile

Test Facilities to ~VVA rear area to test battalions on a rotatin~

basis usin~ the ~~M Float to replace failures

    b    Locate the two test facilities aboard Navel ship in S\A~A

utili::-in~ a float, swap-out masks with a battalion   Test and

separate the swap-outs, put passed mask back in float and set

fai lures aside for possible 1 in~ited repair bv T&EU on site or re-

turn to CC)NUS for full rebuild

          Conduct a ~ 0 int ~4F/MC operation ut i liz in~ the current

~in country facilities operated by U.  S. Ari~y

        Prior to any deplovn~ent of NBC test facilities a contact

team of one 5'7()2 and one 5/11 should be deployed to evaluate the

above recommendations

SUMMAhY.   The FPM must be cleaned and free of  foreign matter

pr i or to any testing by the T&EU   Based on recent environmental

effects studies in SWA an~ desert problems could effect

maintaining masks cleanliness for testing,   or adequate operation

                     However  placement of the facilities aboard

of  test equ 1 pmen t

ft


Document Page: First | Prev | Next | All | Image | This Release | Search