Document Page: First | Prev | Next | All | Image | This Release | Search

File: 123096_sep96_decls30_0013.txt
Page: 0013
Total Pages: 34

Subject: MEDICAL BIOLOGIC WARFARE DEFENSE                                

Unit: OTSG        

Parent Organization: HSC         

Box  ID: BX003203

Folder Title: MED BIO WARFARE DEFENSE INFORMATION PAPER AND SLIDES                                            

Document Number:          1

Folder Seq  #:        246








            PRODUCTION OF BOTULINUM TOXOIDS - USAMRII



                 o CONTINUING DELAYS

                       EQUIPMENT DELIVERY AND INSTALLATION
                       REFURBISHMENT OF LABORATORY SPACE
                       AFTER ODS/S -- "BUSINESS AS USUAL"
                 o INCOMPLETED ACTIONS TO DATE

                     -- TRAINING ON FERMENTERS
                     06 GLASSWARE WASHER
                     06 SEALS AROUND LIGHTS, CABINETS, ETC.
                   VALIDATION OF EQUIPMENT WILL REQUIRE SIX WEEKS
                     (ANTICIPATED START 1 OCTOBER)
                   TRIAL PRODUCTION RUNS AND VALIDATION OF
                     PROCEDURES WILL REQUIRE THREE MONTHS
                   EXPECTED FIRST LOT OF TOXOID -- 1 JUNE 1992

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 34 f:/Week-36/BX003203/MED BIO WARFARE DEFENSE INFORMATION PAPER AND SLIDES/medical biologic warfare defense:12179609282531
Control Fields 17
File Room = sep96_declassified
File Cabinet = Week-36
Box ID = BX003203
Unit = OTSG
Parent Organization = HSC
Folder Title = MED BIO WARFARE DEFENSE INFORMATION PAPER AND SLIDES
Folder Seq # = 246
Subject = MEDICAL BIOLOGIC WARFARE DEFENSE
Document Seq # = 1
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 17-DEC-1996