File: 123096_sep96_decls20_0009.txt
Page: 0009
Total Pages: 12
Subject: COMMANDERS SITREP 78
Unit: VII CORPS
Parent Organization: ARCENT
Box ID: BX000269
Folder Title: DAILY STAFF JOURNALS-6 APR 91-2
Document Number: 18
Folder Seq #: 71
UNCLASSIFIED
(1)(U)(40) REEFERS. (AMBER) VII CORPS STILL REQUIRES 80
ADDITIONAL REEFERS TO SUPPORT OPERATIONS AS TEMPERATURES
INCREASE. POC VII CORPS G4, LTC MANGUM, TASS 9-709-7566-661/658.
(2)(U)C* DCU. (AMBER) IT APPEARS THAT SUFFICIENT
QUANTITIES OF DCU COATS AND TROUSERS ARE ON HAND IN THEATER.
PROBLEM IS OBTAINING THE CORRECT SIZES. CORPS NEEDS MORE MEDIUM
REGULARS. SPECIFICALT@ 7,000 COATS'jibiD 12,600 TROUSERS. NEED
ACCESS TO SIZES IN THEATER. STILL REQUIRED TO OUTFIT 94,000
SOLDIERS IN FLOPPY HATS, KEVLAR COVERS, AND TAN BOOTS. NEED FULL
COURT PRESS TO OBTAIN SUFFICIENT QUANTITIES IN ORDER FOR EACH
SOLDIER TO HAVE ONE PRIOR TO DEPARTURE. FIRST UNIT DEPARTING IS
2ACR ON OR ABOUT 26 APR 91. POC VII CORPS G4 IS LTC MANGUM, TASS
9-709-7566-661/658.
(3)(U@ CLASS IX REQUISITIONING PROCEDURES. (AMBER)
UNDERSTAND PROCEDURES HAVE NOW BEEN DEFINED. PRIORITY 02/999
REQUISITIONS PRIOR TO I MAR 91 MUST BE VALIDATED WITH MI CARDS
FOR 25 SELECTED REPAIR PARTS LINES PER MAJOR SUBORDINATE COMMAND.
ALL REPLENISHMENT'REQUISTT'IONS"'BEFORL?'/A?TER-1 MAR-ANEr'-@'
REQUISITIONS WILL BE PROCESSED UNDER NORMAL PROCEDURES. WE STILL
URGENTLY NEED PARTS FLOW TO RESUME. PLEASE ADVISE WHEN INITIAL
ALOC PALLETS WILL ARRIVE. POC LTC HAYES, TASS 9-709-7566-670.
(44U@M113 ENGINES AND MAJOR ASSEMBLIES. (AMBER)
SHORTAGES IN ENGINES, TRANSMISSIONS AND OTHER MAJOR ASSEMBLIES
CONTINUE TO DEGRADE VII CORPS READINESS DUE TO ZERO BALANCES
THROUGHOUT THE CORPS. SEE CURRENT VII CORPS LOGSTAT FOR DETAILS.
POC VII CORPS G4, LTC HAYES, TASS 9-709-7566-670/672.
9
UNCLASSIFIED
i= 32
J6
| First Page
| Prev Page | Next Page | Back to Text |